Swimming pools

New online application process:

Apply for a permitUpdate and track applications

How to prepare to apply:

Prepare the following materials:

  • State of Title, current within last 30 days, including copies of all covenants, easements and right-of-ways
  • Scaled site plan
  • Detailed cross sections
  • Engineer's Design Drawing (if applicable) for pool design and retaining walls
  • Geotechnical engineer schedules B, D and copy of insurance (if applicable)

Checklists and bulletins:

For more information, please review:

  • Have a conversation with our chatbot by clicking on the blue and white "Chat now" icon in the lower right corner.
  • Building permit application fees will be emailed to you with a link to pay online, payment of the fee is a required part of a complete application.

Need help? Contact us at developmentservicesinfo@kelowna.ca or 250-469-8960.