The functionality of the Southridge stormwater pond network will be enhanced by adding a piped pond overflow to Seon Cr as well as decommissioning the existing, out-dated telemetry based system. These upgrades are necessary to help ensure flood events within the pond's catchment are effectively managed and also act as a safety measure when the high water level of the pond is reached.    

The installation contractor for this project will be the City of Kelowna's construction team.