Stewart Rd West Phase 2
Stewart Rd West is a 2-lane major arterial road between South Perimeter Way and Swamp Rd, approximately 4.8 km in length. With increased traffic volumes anticipated due to the South Perimeter Way connection and continued growth in the Upper Mission, improvements are needed to ensure an acceptable level of traffic safety and operation. The first phase of this project was constructed in 2019 and the second phase is in the design and planning stage with construction planned for 2025.