Southridge Stormwater Pond Upgrade

Home > Our community > Planning & projects > Current capital projects > Southridge Stormwater Pond Upgrade

The functionality of the Southridge stormwater pond network will be enhanced by adding a piped pond overflow to Seon Cr as well as decommissioning the existing, outdated telemetry based system. These upgrades are necessary to help ensure flood events within the pond's catchment are effectively managed and also act as a safety measure when the high water level of the pond is reached.    

The installation contractor for this project was the City of Kelowna's construction team.