Road report
Road information is based on issued road usage permits. All public and private contractors are required to obtain a road usage permit for work affecting traffic flow. Click on a coloured line on the map for details about traffic impacts.
2024 Seasonal Permit - concrete pour. Pump truck will block road access on Dougal Rd on selected days only. Road will be unobstructed on majority of days otherwise. Set up time 6 am but will not start pouring till 7 am
Permit number: RUP2024-0227
SHEPHERD RD to MCINTOSH RD
January 1, 1900 (All day) to December 31, 2024 (All day)
2040 K.L.O Rd - Telus Utility Work - Pole access for aerial placing and drops which include a crossing - AFADs to hold traffic for 3 min max (ITC) while cable crosses the road
Permit number: RUP2024-1040
COMO RD to LEADER RD
November 27, 2024 - 9:00am to November 28, 2024 - 3:30pm
Lane Drop - Multi Lane Road
3081 Hall Rd / Dunsmuir Rd / O'reilly rd / Johnson Rd - Pulling an underground cable as well as replacing 1 pole and installing 1 new pole and anchor.
Permit number: RUP2024-1036
Project contact: Derek Oleksyn
Email: derek.oleksyn@fortisbc.com
ALBERTA CT to JOHNSON RD
November 12, 2024 - 8:00am to November 26, 2024 - 3:00pm
Single Lane Alternating
HALL RD to O'REILLY RD
November 12, 2024 - 8:00am to November 26, 2024 - 3:00pm
Single Lane Alternating
JOHNSON RD to WOODLAND CR
November 12, 2024 - 8:00am to November 26, 2024 - 3:00pm
Single Lane Alternating
JOHNSON RD to WOODLAND CR
November 12, 2024 - 8:00am to November 26, 2024 - 3:00pm
Single Lane Alternating
DUNSMUIR RD to ALBERTA CT
November 12, 2024 - 8:00am to November 26, 2024 - 3:00pm
Single Lane Alternating
JOHNSON RD to MANITOBA PL
November 12, 2024 - 8:00am to November 26, 2024 - 3:00pm
Single Lane Alternating
760 Cantina Court - Building a Dry-stack engineered Rock Retaining Wall in the backyard. Needing use of cul-de-sac for delivery of rock product. We will have the cones set up and wearing vizi vests while moving rock to backyard. We will also make sure to
Permit number: RUP2024-1043
SOUTH RIDGE DR to EAST END OF ROAD
November 7, 2024 - 8:00am to December 7, 2024 - 4:00pm
No Disruption
953-1045 Lauries Ave / 943-1049 Borden Ave / 1872 Bowes St
Installing 5 new Hydrants - Will be starting 2 at 953-1045 Lauries Ave, then 2 at 943-1049 Borden Ave and the last one at 1872 Bowes St.
They are all between Ethel St and Gordon Dr
Permit number: RUP2024-1038
SOUTH END OF ROAD to SUTHERLAND AVE
November 12, 2024 - 7:00am to November 22, 2024 - 4:30pm
Single Lane Alternating
BOWES ST to GORDON DR
November 12, 2024 - 7:00am to November 22, 2024 - 4:30pm
Single Lane Alternating
BORDEN AVE to LAURIER AVE
November 12, 2024 - 7:00am to November 22, 2024 - 4:30pm
Single Lane Alternating
ETHEL ST to BOWES ST
November 12, 2024 - 7:00am to November 22, 2024 - 4:30pm
Single Lane Alternating
BOWES ST to GAGNON PL
November 12, 2024 - 7:00am to November 22, 2024 - 4:30pm
Single Lane Alternating
ETHEL ST to BOWES ST
November 12, 2024 - 7:00am to November 22, 2024 - 4:30pm
Single Lane Alternating
SUTHERLAND AVE to BORDEN AVE
November 12, 2024 - 7:00am to November 22, 2024 - 4:30pm
Single Lane Alternating
SOUTH END OF ROAD to SUTHERLAND AVE
November 12, 2024 - 7:00am to November 22, 2024 - 4:30pm
Single Lane Alternating
SUTHERLAND AVE to NORTH END OF ROAD
November 12, 2024 - 7:00am to November 22, 2024 - 4:30pm
Single Lane Alternating
Abbott St 1930 - remove concrete letdown and install regular curb, gutter and sidewalk
Permit number: RUP2024-1032
BEACH AVE to VIMY AVE
November 7, 2024 - 7:00am to November 21, 2024 - 5:00pm
No Disruption
Abbott St 3051 - install gas main extension. Lane asphalt cut and restoration required. Lane closure required. Possibility of temporary concrete patch with asphalt restoration in spring. Will renew permit for permanent restoration. Residents will be
Permit number: RUP2024-1017
ABBOTT ST to LANE
November 18, 2024 - 7:00am to November 29, 2024 - 4:00pm
Full Road Closure, No Through Traffic, Detour
Abbott St 3061 - install storm main
Permit number: RUP2024-0795
ABBOTT ST to PANDOSY ST
August 27, 2024 - 7:00am to November 30, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Adventure Rd 280-290 - urgent repair. work with Fortis. Install new pipe.
Permit number: RUP2024-1071
Project contact: Randy Frasch
Email: rfraschent@shaw.ca
BENCHVIEW RD to DOUGALL RD S
November 19, 2024 - 7:00am to November 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Appaloosa Rd 3256 - Utility trailer partially on City road shoulder. No traffic interruptions.
Permit number: RUP2024-0237
Project contact: Liam Gibson
Email: lgibson@orionconstruction.ca
ACADEMY WAY to PINTO RD
March 22, 2024 (All day) to December 31, 2024 (All day)
No Disruption
ACADEMY WAY to PINTO RD
March 22, 2024 (All day) to December 31, 2024 (All day)
Arrowroot Dr 3486 - install Fortis duct
Permit number: RUP2024-1050
Project contact: Brad Hanks
Email: brad@advancedpowerlines.ca
MCKINLEY BEACH LANE to MAIDEN GRASS CT
November 18, 2024 - 7:00am to November 28, 2024 - 5:00pm
Single Lane Alternating
Asher Rd 500 - wood prefabricated Wall Delivery. Road Closure Required - 1 day.
Permit number: RUP2024-1064
Project contact: Lisa Lapointe
PONTO RD to LEATHEAD RD
November 25, 2024 - 7:00am to November 28, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Belaire 1365 / Chandler St 1840 & 1850 - continue use of frontage including sidewalk for site office, garage disposal C-can, loading and unloading of trucks. Site is fully fenced.
Permit number: RUP2024-0831
DEVONSHIRE AVE to CHANDLER ST
September 1, 2024 - 7:00am to December 31, 2024 - 7:00pm
No Disruption
Benvoulin Crt 2165 @ Benvoulin Rd bet Cooper & Mayer) - upgrade water main, excavate and remove existing water main to replace and upgrade, replace hydrant, install new sidewalk curb and repave. Wanting to close southbound lanes only and have one lane op
Permit number: RUP2024-0758
Project contact: Ryan Nojonen
Email: ryan@ebkconstruction.ca
COOPER RD to MAYER RD
October 7, 2024 - 9:00am to November 28, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Bertram Ave 1333 - garbage bin in 2 City parking stalls
Permit number: RUP2024-0944
FULLER AVE to CAWSTON AVE
October 8, 2024 (All day) to December 31, 2024 (All day)
Bertram St 1333 - Breezeway install along sidewalk infront of address. Will allow edestrians to use the sidewalk without construction impedance. Office on top of breezeway.
Permit number: RUP2024-0575
FULLER AVE to CAWSTON AVE
August 1, 2024 (All day) to December 31, 2024 (All day)
FULLER AVE to CAWSTON AVE
August 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Bertram St 1333 - concrete pump set up outside of 1333 Bertram for a concrete pour
Permit number: RUP2024-1065
FULLER AVE to CAWSTON AVE
November 22, 2024 -
7:00am to 1:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Bertram St 1333 - concrete pump set up outside of 1333 Bertram for a concrete pour
Permit number: RUP2024-1066
FULLER AVE to CAWSTON AVE
November 28, 2024 -
7:00am to 3:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Bertram St 1333 - concrete pump set up outside of 1333 Bertram for a concrete pour
Permit number: RUP2024-1067
FULLER AVE to CAWSTON AVE
December 10, 2024 -
7:00am to 1:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
FULLER AVE to CAWSTON AVE
December 5, 2024 (All day)
Bertram St 1333 - lay down area for construction material
Permit number: RUP2024-0432
BERTRAM ST to LANE
May 27, 2024 (All day) to December 31, 2024 (All day)
No Disruption
FULLER AVE to CAWSTON AVE
May 27, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Boynton Pl 630 - parking space and sidewalk use for construction in area.
Permit number: RUP2024-0023
HIGHPOINTE DR to CARAMILLO RD
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Cara Glen Court 1455 - Debri bins and equipment parked on City road shoulder for construction underway. 3 parking stalls only will be included with this permit.
Permit number: RUP2023-0976
Project contact: Joe Brown
Email: jbrown@efcdev.ca
SOUTH END OF ROAD to CARA GLEN WAY
January 1, 2024 (All day) to November 30, 2024 (All day)
No Disruption
Cawston Ave 660/604 @ 1333 Bertram St - removing walking path infront at Cawston Ave and install Fortis duct. Trench across Cawston Ave at the Bertram crossing. Restore asphalt.
Permit number: RUP2024-0994
Project contact: Brad Hanks
Email: brad@advancedpowerlines.ca
BERTRAM ST to RICHTER ST
October 29, 2024 - 7:00am to November 22, 2024 - 5:00pm
Single Lane Alternating
FULLER AVE to CAWSTON AVE
October 29, 2024 - 7:00am to November 22, 2024 - 5:00pm
Single Lane Alternating
Comment:Abbott St 3061/Cedar Ave - extend construction fencing to the edge of the roadway to allow for a safer work area for site personnel as well as the general public. Ongoing construction of an 87 unit wood frame, 7 story building.
Permit number: RUP2023-0972
MEIKLE AVE to NEWSOM AVE
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
ABBOTT ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
Comment:Benvoulin Rd @ 2241 Springfield Rd - trucks hauling on and off site with earth materials. Few intermittent interruptions. No real traffic interruptions. Will follow rules of the road.
Permit number: RUP2024-0006
MAYER RD to SPRINGFIELD RD
November 1, 2024 - 9:00am to November 29, 2024 - 3:00pm
Lane Drop - Multi Lane Road
Coronation Ave (Richter to Ethel) - removal of old a/c sewer, install of new sewer, pave prep and paving from Richter St to Thel St along Coronation Ave resulting in a full road closure City of Kelowna project, homeowner notices and signs will be posted a
Permit number: RUP2024-0550
RICHTER ST to ETHEL ST
June 24, 2024 - 7:00am to November 30, 2024 - 3:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Coronation Ave 1036 - upgrade watermain, storm upgrades. Only closing half the road as per TMP
Permit number: RUP2024-0910
GRAHAM ST to GORDON DR
November 15, 2024 - 7:00am to December 6, 2024 - 7:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Coronation Ave 620 (lane) - full closure of the rear laneway bet 620 Coronation Ave and 603 Clement. Lane will be open to local traffic only. Install storm drywell, catch basin along with Fortis
Permit number: RUP2024-0925
ST. PAUL ST to LANE
October 15, 2024 - 7:00am to November 23, 2024 - 7:00pm
Local Traffic Only, No Through Traffic, Detour
CORONATION AVE to LANE N OF CORONATION AVE
October 15, 2024 - 7:00am to November 23, 2024 - 7:00pm
Local Traffic Only, No Through Traffic, Detour
Devonshire 1274 - deliveries and any traffic interruptions
Permit number: RUP2024-0855
PRIDHAM AVE to BELAIRE AVE
September 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
PRIDHAM AVE to BELAIRE AVE
September 1, 2024 (All day) to December 31, 2024 (All day)
Dougal Rd N 540 (Lane) - loading and off loading materials in back lane. Brief 15 minute closure while load and unloading.
Permit number: RUP2024-0852
Project contact: Hans Gerritsen 403-850-1542
Email: karbabifard@wcpg.ca
MCINTOSH RD to LEATHEAD RD
September 9, 2024 - 6:00am to December 31, 2024 - 6:00pm
Lane Drop - Multi Lane Road
Dougal Rd S 165 - sidewalk closure for building construction purposes. Sidewalk closure signs posted and pedestrians detoured to sidewalk on other side of the street. 60 meters used. TMP attached
Permit number: RUP2024-1014
GRAY RD to VALLEYVIEW RD
October 31, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Doyle Ave 550 / St Paul St- Jersey barrier set up along alley, Doyle Ave and St Paul for public safety from construction traffic and future excavation
Permit number: RUP2023-0973
Project contact: Lauren Cooper
Email: lauren.cooper@ledcor.com
ST PAUL ST to BERTRAM ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Fleming Rd 500 - paving and pouring new sidewalk
Permit number: RUP2024-0974
Project contact: Sarb Hayer
HOUGHTON RD to LEATHEAD RD
October 16, 2024 - 7:00am to November 30, 2024 - 8:00pm
Single Lane Alternating
Fortis Weekly Service Installs - various City streets
Permit number: RUP2024-1059
HEMMERLING CT to HEMMERLING CT
November 18, 2024 - 7:00am to November 22, 2024 - 6:00pm
Lane Drop - Multi Lane Road
LADD CT to BULL CR
November 18, 2024 - 7:00am to November 22, 2024 - 6:00pm
Lane Drop - Multi Lane Road
Frost Rd 1055 - the project involves constructing a secure pedestrian scaffold tunnel along the sidewalk at the frontage of road.
Permit number: RUP2024-1052
Project contact: Josh Arneson
Email: jarneson@gohighstreet.ca
GORDON DR to STEELE RD
December 2, 2024 - 6:00am to December 31, 2024 - 6:00pm
No Disruption
Graham Rd 875/Matt Rd - install new water, sanitary, storm for new development including sidewalks, curbs and asphalt.
Permit number: RUP2024-0954
Project contact: Ricky Sekhon
Email: ricky.s@bostonearthworks.com
BRIAN RD to GRAHAM RD
October 15, 2024 - 7:00am to November 30, 2024 - 5:00pm
Single Lane Alternating
RUSTON RD to MATT RD
October 15, 2024 - 7:00am to November 30, 2024 - 5:00pm
Single Lane Alternating
MATT RD to STIRLING RD
October 15, 2024 - 7:00am to November 30, 2024 - 5:00pm
Single Lane Alternating
Hoarding - portion of road.
Permit number: RUP2024-1000
GORDON DR to ASPEN CT
November 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Single Lane Alternating
June Springs Rd & Miller Rd - replacing power poles some in old holes and some digging new holes beside the old ones and changing out the power line.
Permit number: RUP2024-1076
Project contact: Darren Belanger
Email: dbelanger@allteck.com
LEMKY RD to SPIERS RD
November 25, 2024 - 8:30am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
TATLOW RD to LEMKY RD
November 25, 2024 - 8:30am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
JUNE SPRINGS RD to EAST END OF ROAD
November 25, 2024 - 8:30am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
MCCLAIN RD to TATLOW RD
November 25, 2024 - 8:30am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
MILLER RD to MCCLAIN RD
November 25, 2024 - 8:30am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
Kerr Rd 1837 - install new Fortis conduit and electrical service underground from overhead pole on other side of the street to concrete service box location.
Permit number: RUP2024-0982
Project contact: Jeff Snaychuk
Email: jeff@llelectric.ca
DRAKE RD to KATHLER RD
November 14, 2024 - 7:00am to November 25, 2024 - 3:30pm
Single Lane Alternating
Lake Ave 267 - gravel used for landscaping will be piled infront of home.
Permit number: RUP2024-1073
Email: tdh9791@gmail.com
ABBOTT ST to MAPLE ST
November 19, 2024 (All day) to November 24, 2024 (All day)
No Disruption
Lakeshore Rd ( Simeon Ct to Hobson Rd) - underground cable placing. No excavation required.
Permit number: RUP2024-0916
Project contact: Kelly Anargyros
Email: kelly@worldwideon.ca
SIMEON CT to HOBSON RD
October 1, 2024 - 9:00am to November 30, 2024 - 3:30pm
No Disruption
Lakeshore Rd (Dehart Rd to Lexington & Bluebird - system improvement gas main install. SLAT my only occur 9am to 3:30pm Monday to Friday.
Permit number: RUP2024-0988
CORYELL RD to SIMEON CT
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
HOBSON RD to OLD MEADOWS RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
OLD MEADOWS RD to ARMOUR CR
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
ARMOUR CR to LEQUIME RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
KENSINGTON DR to CORYELL RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
WILLMS RD to KENSINGTON DR
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
SIMEON CT to HOBSON RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
GREENE RD to WILLMS RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
DEHART RD to GREENE RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
LEQUIME RD to BLUEBIRD RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
Lawrence Ave 1131 (Formerly 1605 Gordon Dr) - build 6 story building. Facilitate material drop off without distrubance to traffic on Gordon Dr, the contractor wishes to use the lane currently used for a bus stop and public parking. They will separate th
Permit number: RUP2023-0971
GORDON DR to CENTENNIAL CR
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
GORDON DR to CENTENNIAL CR
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Leckie ATC / Dilworth Dr - extension from Okanagan Rail Trail to the Mission Park Greenway along the north side of Leckie Rd. See attached maps.
Permit number: RUP2024-0321
ENTERPRISE WAY to HWY 97 N
November 1, 2024 - 7:00am to December 5, 2024 - 5:30pm
Single Lane Alternating
DILWORTH DR to HUNTER RD
November 1, 2024 - 7:00am to December 5, 2024 - 5:30pm
Single Lane Alternating
ENTERPRISE WAY to LECKIE PL
November 1, 2024 - 7:00am to December 5, 2024 - 5:30pm
Single Lane Alternating
HUNTER RD to ENTERPRISE WAY
November 1, 2024 - 7:00am to December 5, 2024 - 5:30pm
Single Lane Alternating
Leon Ave 278 - off loading and pumping concrete. Deliveries to site. Personnel entering or exiting site. Intermittent.
Permit number: RUP2023-0969
Project contact: Stephanie Mattson
Email: stephanie@amegagroup.ca
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Leon Ave 278 - usage of partial lane and sidewalk on the north side of Leon Ave bet Abbott & Water St for the construction of the Water Str by the Park Project. Also, used for deliveries and laydown for general construction activities.
Permit number: RUP2024-0548
Project contact: Stephanie Mattson
Email: stephanie@amegagroup.ca
LEON AVE to LAWRENCE AVE
June 1, 2024 (All day) to December 31, 2024 (All day)
Single Lane Alternating
Leon Ave 278 Hoarding Permit Issued - to show permit in place.
Permit number: RUP2023-0970
Project contact: Stephanie Mattson
Email: stephanie@amegagroup.ca
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Leon Ave 863 - bin will be used for garbage from demoing unties at the Dorchester. Bin to be placed on the parking should of the road.
Permit number: RUP2024-1004
RICHTER ST to ETHEL ST
November 1, 2024 (All day) to December 1, 2024 (All day)
No Disruption
Manhattan Dr 955 - periodic deliveries. Temporary interruptions
Permit number: RUP2024-0895
Project contact: Olaf Nieczyporowicz
Email: olaf.niec@tkiconstruction.ca
MANHATTAN DR to GUY ST
October 8, 2024 - 10:00am to December 31, 2024 - 4:00pm
Local Traffic Only, No Through Traffic, Detour
FLINTOFT AVE to GUY ST
September 20, 2024 (All day) to November 30, 2024 (All day)
Lane Drop - Multi Lane Road
MANHATTAN DR to GUY ST
September 20, 2024 (All day) to November 30, 2024 (All day)
Lane Drop - Multi Lane Road
MANHATTAN DR to GUY ST
November 20, 2024 - 7:00am to November 21, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
McClure Rd 549-599- storm drain and sidewalk upgrades
Permit number: RUP2024-0961
POPLAR RD to DOEKSEN RD
October 16, 2024 - 7:00am to December 13, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
DOEKSEN RD to BONJOU RD
October 16, 2024 - 7:00am to December 13, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
KEITH RD to POPLAR RD
October 16, 2024 - 7:00am to December 13, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
McCurdy Rd 948 - install fibre conduit for Rogers Canada via directional drill.
Permit number: RUP2024-1003
Phone: 778-870-9562
Email: office@ironmandrilling.com
MORRISON RD to GIBSON RD
November 1, 2024 - 9:00am to November 22, 2024 - 7:00pm
Lane Drop - Multi Lane Road
McCurdy Rd East 712 - install 3 sanitary manholes. Installlation of piping plus tie- into existing manhole on Lacombe. Will include sidewal closure, curbing removal and restoration after utility is installed. Must provide a TMP for pedestrian detour.
Permit number: RUP2024-0950
MCCURDY RD E to SUMAC RD E
November 16, 2024 - 9:00am to November 29, 2024 - 3:30pm
Single Lane Alternating
LACOMBE RD to MORRISON RD
November 16, 2024 - 9:00am to November 29, 2024 - 3:30pm
Single Lane Alternating
Noble Crt 1550 - construction trailer on City road shoulder and block sidewalk along west side of Noble Crt. (two way traffic to be maintained) Pedestrians can cross Noble Crt on Bernard Ave and use sidewalk on the East side of Noble Crt
Permit number: RUP2024-0695
Project contact: Joe Reynolds
Email: joe@westpointprojects.com
SOUTH END OF ROAD to BERNARD AVE
July 25, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Note Road Closure on Moss Crt Oct 21 - Oct 26th, 2024
Ambrosi Rd 1946 - letdown removal, sidewalk removal, water decommission, prep and pour curb and sidewalks, asphalt patch. Install irrigation line across Springfield Rd WB lanes. Install island for l
Permit number: RUP2024-0843
SOUTH END OF ROAD to EVERGREEN CT
November 18, 2024 - 7:00am to November 29, 2024 - 5:00pm
Lane Drop - Multi Lane Road
SPRINGFIELD RD to AGASSIZ RD
November 18, 2024 (All day) to November 22, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
On Kinnear at 2609-2611 Richter St - Install Rogers condult
Permit number: RUP2024-1049
RICHTER ST to CURTS ST
November 14, 2024 - 7:00am to November 22, 2024 - 4:30pm
Single Lane Alternating
Pridham Ave 1267 to 1319 & Devonshire Ave 1304 - install new Fortis utility and Street lighting conduit, base crossing Pridham & Devonshire. 3 water line residential service decommissioning on Pridham.
Permit number: RUP2024-0951
PRIDHAM AVE to BELAIRE AVE
October 15, 2024 - 7:00am to November 28, 2024 - 6:00pm
Single Lane Alternating
WEST END OF ROAD to DEVONSHIRE AVE
October 15, 2024 - 7:00am to November 28, 2024 - 6:00pm
Single Lane Alternating
DEVONSHIRE AVE to CHANDLER ST
October 15, 2024 - 7:00am to November 28, 2024 - 6:00pm
Single Lane Alternating
Raymer Rd 709 - alteration of existing gas main in EB boulevard of Raymer Rd. Around the 700 block. Work is co-ordinated with the frontage improvements required by the City for the development of 709 Raymer Rd
Permit number: RUP2024-1058
RICHTER ST to CURTS ST
November 25, 2024 - 8:00am to November 29, 2024 - 4:00pm
Lane Drop - Multi Lane Road
Raymer Rd 709 - install new sterm/manholes, water, sewer to site including curb, gutter, sidewalk
Permit number: RUP2024-0948
Project contact: Darren Ryan
Email: darren@radcontracting.ca
HORAK RD to GORDON DR
October 16, 2024 (All day) to November 22, 2024 (All day)
Local Traffic Only, No Through Traffic, Detour
Richter St 2609 - site hoarding area for storage of materials (Bike lane not affected. Total area is 55 m2 in area.
Permit number: RUP2024-0065
KINNEAR AVE to WARDLAW AVE
January 15, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Royal Ave & Long St - laydown and trailer site/seacan placement.
Permit number: RUP2023-0990
Project contact: Brady Allen
Email: brady.allen@bird.ca
LONG ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Lane Drop - Multi Lane Road
LONG ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Lane Drop - Multi Lane Road
Rutland Rd N 169 - one lane and sidewalk closure for material laydown and deliveries/hoisting. A pedestrian provision has been accounted for. Total of 165 sqm of workk zone.
Permit number: RUP2024-0180
Phone: 403-367-1330
HWY 33 W to SHEPHERD RD
May 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Rutland Sewer North East Phase 1 - Prior Rd S (starting on this road), Robson Rd E, Dillman Rd, Holbrook Rd E, Spartan Rd, Mallach
Rd, Jade Rd and Scaraboro Rd
Install sanitary sewer
Permit number: RUP2024-0347
MILTON RD to HWY 33 E
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
RUTLAND RD S to SCARBORO RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
MALLACH RD to MOLNAR RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
HUSCH RD to HOLBROOK RD E
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
SCARBORO RD to MALLACH RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
HOLBROOK RD E to MILTON RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
HUSCH RD to BELL RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
BELL RD to MOLNAR RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
JUROME RD to ROBSON RD E
November 12, 2024 - 7:00am to November 22, 2024 - 5:00pm
Single Lane Alternating
BELL RD to MOLNAR RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
HUSCH RD to BELL RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
Saucier Ave 812 - closure of sidewalk, shoulder and single westbound lane of Saucier Ave. Site hoarding will be for approx 2 years.
Permit number: RUP2023-0987
Project contact: Brodie Scott
Email: brodie@westrichpacific.com
RICHTER ST to ETHEL ST
January 1, 2024 - 7:00am to December 31, 2024 - 7:00pm
Single Lane Alternating
Seasonal Permit - all non excavation work on various City streets for 2024.
Permit number: RUP2023-0980
PRIDHAM AVE to DEVONSHIRE AVE
November 18, 2024 - 9:00am to November 21, 2024 - 2:00pm
Single Lane Alternating
COOPER RD to BENVOULIN CT
November 25, 2024 - 9:00am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to SPRINGFIELD RD
November 25, 2024 - 9:00am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
Sutherland Ave 1280/Pridham Ave - Sidewalk closure only. Traffic will not be affected at all for the duratiion of this permit. Install of shallow utilities and tie-in off site utilities to complete on Sutherland and Pridham Ave.
Permit number: RUP2024-0681
Phone: 250-300-5093
Email: mkotter@millennialdev.ca
PRIDHAM AVE to BELAIRE AVE
July 13, 2024 (All day) to December 31, 2024 (All day)
No Disruption
WEST END OF ROAD to DEVONSHIRE AVE
July 13, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Tree Mtce _ Removal - Various City streets. No excavation.
Permit number: RUP2024-0007
Phone: 250-862-0734
Email: info@kelokatrafficcontrol.ca
BERNARD AVE to LAWSON AVE
April 17, 2024 - 9:00am to December 17, 2024 - 2:00pm
Lane Drop - Multi Lane Road
ARMOUR CR to LEQUIME RD
November 18, 2024 - 9:00am to November 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
LEQUIME RD to BLUEBIRD RD
November 18, 2024 - 9:00am to November 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
SPRUCEGLEN DR to SPRUCEMONT CT
May 30, 2024 - 8:00am to December 31, 2024 - 3:30pm
Continually Moving Work
SPRUCEMONT CT to LIPSETT CT
May 30, 2024 - 8:00am to December 31, 2024 - 3:30pm
Continually Moving Work
HOBSON RD to OLD MEADOWS RD
November 18, 2024 - 9:00am to November 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
OLD MEADOWS RD to ARMOUR CR
November 18, 2024 - 9:00am to November 22, 2024 - 3:30pm
Lane Drop - Multi Lane Road
LEQUIME RD to BLUEBIRD RD
November 18, 2024 - 9:00am to November 22, 2024 - 3:30pm
No Disruption
OLD MEADOWS RD to ARMOUR CR
November 18, 2024 - 9:00am to November 22, 2024 - 3:30pm
No Disruption
ARMOUR CR to LEQUIME RD
November 18, 2024 - 9:00am to November 22, 2024 - 3:30pm
No Disruption
Trestle Ridge Dr 450 & 470 - new water, sanitary and storm service installation. road closure will be bet 470-458 Trestle Ridge Dr. Refer to attached maps/plan for excavation area, road closure points and detour route.
Permit number: RUP2024-0969
TRESTLE RIDGE CT to UPPER MISSION DR
November 9, 2024 - 7:00am to November 29, 2024 - 3:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Underhill St 1960 & Baron Rd - concrete pour to job site
Permit number: RUP2024-1075
DILWORTH DR to UNDERHILL ST
November 25, 2024 -
9:30am to 3:00pm
Lane Drop - Multi Lane Road
HAYNES RD to BARON RD
November 25, 2024 -
9:30am to 3:00pm
Lane Drop - Multi Lane Road
Union Rd (bet Upper Canyon Dr & Begbie Rd) - upgrading of existing storm main for future developments. Extend sanitary, water and shallow utilities into future developments. Widen out road for new turning movements, and muiti-use path. Concrete flatwor
Permit number: RUP2024-0824
BEGBIE RD to UPPER CANYON DR N
September 3, 2024 - 7:00am to December 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Uplands Dr 359 - work in ditch to install sampling station. Hydrovac
Permit number: RUP2024-1072
UPLANDS CT to OKAVIEW RD
November 21, 2024 - 7:00am to November 22, 2024 - 5:00pm
Single Lane Alternating
Water St 1580 & 1570 - Demolish building and construct new building. Hoarding required on Lawrence, lane and Water St
Permit number: RUP2024-0068
Project contact: Slava Korshunov
Email: skorshunov@vinesrebar.com
ABBOTT ST to WATER ST
January 1, 2024 - 8:00am to December 31, 2024 - 4:00pm
Lane Drop - Multi Lane Road
LAWRENCE AVE to LANE
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Water St 1630 - aerial lift boom will be used on closed off lane on SB Water St. Sidewalk closures will be in place at Lawrence and Water and Water & Leon. Pedestrians will cross at these locations. Single lane will have flaggers to divert SB traffic a
Permit number: RUP2024-1029
LEON AVE to LAWRENCE AVE
November 12, 2024 - 9:00am to November 21, 2024 - 4:00pm
Single Lane Alternating
Water St 1659 / Leon Ave - errect scafolding to close portion of walkway at the corner to work on building.
Permit number: RUP2024-0008
WATER ST to PANDOSY ST
January 5, 2024 (All day) to December 31, 2024 (All day)
No Disruption
HARVEY AVE to LEON AVE
January 5, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Ziprick Rd 540 - work with Fortis. Vac truck install Fortis conduit
Permit number: RUP2024-1070
Project contact: Randy Frasch
Email: rfraschent@shaw.ca
SIMPSON AVE to CORNWALL RD
November 20, 2024 - 7:00am to November 29, 2024 - 3:30pm
Lane Drop - Multi Lane Road