Road report

Road information is based on issued road usage permits. All public and private contractors are required to obtain a road usage permit for work affecting traffic flow. Click on a coloured line on the map for details about traffic impacts. 

Subscribe to road report e-updates  

2024 Seasonal Permit - concrete pour. Pump truck will block road access on Dougal Rd on selected days only. Road will be unobstructed on majority of days otherwise. Set up time 6 am but will not start pouring till 7 am
Permit number: RUP2024-0227
SHEPHERD RD to MCINTOSH RD
January 1, 1900 (All day) to December 31, 2024 (All day)
Abbott St 3061 - shallow utility installation. Road will be closed 7am to 5pm Mon to Fri.
Permit number: RUP2024-0795
Project contact: Sheilan Laing
Phone: 604-845-6113
ABBOTT ST to PANDOSY ST
August 27, 2024 - 7:00am to December 30, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
MEIKLE AVE to NEWSOM AVE
August 27, 2024 - 7:00am to December 30, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
ABBOTT ST to PANDOSY ST
August 27, 2024 (All day) to February 28, 2025 (All day)
Full Road Closure, No Through Traffic, Detour
MEIKLE AVE to NEWSOM AVE
August 27, 2024 (All day) to February 28, 2025 (All day)
Full Road Closure, No Through Traffic, Detour
Appaloosa Rd 3256 - Utility trailer partially on City road shoulder. No traffic interruptions.
Permit number: RUP2024-0237
Project contact: Liam Gibson
ACADEMY WAY to PINTO RD
March 22, 2024 (All day) to December 31, 2024 (All day)
No Disruption
ACADEMY WAY to PINTO RD
March 22, 2024 (All day) to December 31, 2024 (All day)
Belaire 1365 / Chandler St 1840 & 1850 - continue use of frontage including sidewalk for site office, garage disposal C-can, loading and unloading of trucks. Site is fully fenced.
Permit number: RUP2024-0831
Project contact: Clayton Unruh
Phone: 778-215-1187
DEVONSHIRE AVE to CHANDLER ST
September 1, 2024 - 7:00am to December 31, 2024 - 7:00pm
No Disruption
Benvoulin Rd for 2165 Benvoulin Crt - concrete works along the property line running along Benvoulin Rd, closer to the Cooper Rd right turn. No excavation
Permit number: RUP2024-1150
Project contact: Aaron Kempin
COOPER RD to MAYER RD
December 23, 2024 -
7:00am to 3:30pm
Lane Drop - Multi Lane Road
Benvoulin Rd/Mayer Rd & Byrns Rd - aerial placing, UG placing & UG splicing. No excavation required. No excavation. Everything will be completed using existing infrastructure of hydro poles and manholes to pull underground.
Permit number: RUP2024-1149
Project contact: Ryan Quellette
BEETLESTONE DR to BYRNS RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
BYRNS RD to COOPER RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to BENVOULIN RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
COOPER RD to MAYER RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
MAYER RD to SPRINGFIELD RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
BURTCH RD to BENVOULIN RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
Bertram Ave 1333 - garbage bin in 2 City parking stalls
Permit number: RUP2024-0944
Project contact: Levi Maximick
Phone: 236-597-7520
FULLER AVE to CAWSTON AVE
October 8, 2024 (All day) to December 31, 2024 (All day)
Bertram St (Leon to Harvey Ave ) NB & SB - construction of the north ramp overpass. Works include asphalt, landscaping, concrete removal, deep and shallow foundation work, construction of an ongrade and suspended concrete ramp structure.
Permit number: RUP2024-0141
Project contact: Zane Weal
Phone: 403-585-7055
LEON AVE to BERTRAM ST
March 4, 2024 (All day) to December 31, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Bertram St 1333 - install storm manhole & CB
Permit number: RUP2024-1141
Project contact: Randy Smith
Phone: 250-826-8876
FULLER AVE to CAWSTON AVE
January 6, 2025 - 7:00am to January 17, 2025 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
Bertram St 1333 - Breezeway install along sidewalk infront of address. Will allow edestrians to use the sidewalk without construction impedance. Office on top of breezeway.
Permit number: RUP2024-0575
Project contact: Levi Maximick
Phone: 778-760-5525
FULLER AVE to CAWSTON AVE
August 1, 2024 (All day) to December 31, 2024 (All day)
FULLER AVE to CAWSTON AVE
August 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Bertram St 1333 - Concrete pump setup outside for a concrete pour.
Permit number: RUP2024-1123
Project contact: Levi Maximick
Phone: 778-760-5525
FULLER AVE to CAWSTON AVE
December 23, 2024 -
6:00am to 3:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Bertram St 1333 - lay down area for construction material
Permit number: RUP2024-0432
Project contact: Levi Maximick
Phone: 778-760-5525
BERTRAM ST to LANE
May 27, 2024 (All day) to December 31, 2024 (All day)
No Disruption
FULLER AVE to CAWSTON AVE
May 27, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Boynton Pl 630 - parking space and sidewalk use for construction in area.
Permit number: RUP2024-0023
Project contact: Thomas Leney
Phone: 236-878-9113
HIGHPOINTE DR to CARAMILLO RD
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Cara Glen Court 1455 - Debri bins and equipment parked on City road shoulder for construction underway. 3 parking stalls only will be included with this permit.
Permit number: RUP2023-0976
Project contact: Sean Macleod
SOUTH END OF ROAD to CARA GLEN WAY
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Chandler St/Belaire Ave/Pridham - use of street and sidewalk for site office, garage disposal storage. C-can loading and unloading of trucks. Site is fully fenced.
Permit number: RUP2024-1148
Project contact: Mike Partington
Phone: 250-980-6800
DEVONSHIRE AVE to CHANDLER ST
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
DEVONSHIRE AVE to CHANDLER ST
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
PRIDHAM AVE to BELAIRE AVE
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
Comment:Abbott St 3061/Cedar Ave - extend construction fencing to the edge of the roadway to allow for a safer work area for site personnel as well as the general public. Ongoing construction of an 87 unit wood frame, 7 story building.
Permit number: RUP2023-0972
Project contact: Gary Klassen/Kanina Wright
Phone: 250-448-8810
MEIKLE AVE to NEWSOM AVE
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
ABBOTT ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
Comment:Benvoulin Rd @ 2241 Springfield Rd - trucks hauling on and off site with earth materials. Few intermittent interruptions. No real traffic interruptions. Will follow rules of the road.
Permit number: RUP2024-0006
Project contact: Jeff Walowski
Phone: 204-777-1972
BENVOULIN CT to BENVOULIN RD
December 23, 2024 - 9:00am to December 24, 2024 - 3:00pm
Lane Drop - Multi Lane Road
Crowley Ave & Ethel St - no installation of works, opening up bellhole to check depth of existing main prior to works being installed in the spring/summer 2025
Permit number: RUP2024-1151
Project contact: Maddi Stevens
Phone: 250-663-9911
WEDDELL PL to CROWLEY AVE
January 6, 2025 - 8:00am to January 10, 2025 - 4:00pm
Lane Drop - Multi Lane Road
WEDDELL PL to ETHEL ST
January 6, 2025 - 8:00am to January 10, 2025 - 4:00pm
Lane Drop - Multi Lane Road
Devonshire 1274 - deliveries and any traffic interruptions
Permit number: RUP2024-0855
Project contact: Marlon Kotter
Phone: 250-300-5093
PRIDHAM AVE to BELAIRE AVE
September 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
PRIDHAM AVE to BELAIRE AVE
September 1, 2024 (All day) to December 31, 2024 (All day)
Dougal Rd N 540 (Lane) - loading and off loading materials in back lane. Brief 15 minute closure while load and unloading.
Permit number: RUP2024-0852
Project contact: Hans Gerritsen 403-850-1542
MCINTOSH RD to LEATHEAD RD
September 9, 2024 - 6:00am to December 31, 2024 - 6:00pm
Lane Drop - Multi Lane Road
Dougal Rd S 165 - sidewalk closure for building construction purposes. Sidewalk closure signs posted and pedestrians detoured to sidewalk on other side of the street. 60 meters used. TMP attached
Permit number: RUP2024-1014
Project contact: Karan Kler
Phone: Karam Kler
GRAY RD to VALLEYVIEW RD
October 31, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Doyle Ave 550 / St Paul St- Jersey barrier set up along alley, Doyle Ave and St Paul for public safety from construction traffic and future excavation
Permit number: RUP2023-0973
Project contact: Lauren Cooper
ST PAUL ST to BERTRAM ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Ethel/Trench/Broadway - Royal View water main transmission design and implementation support. Hydrovacing.
Permit number: RUP2024-1137
Project contact: Kyle Jones
Phone: 778-878-2085
CAMBRIDGE AVE to WALROD ST
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
KNOX MOUNTAIN DR to KINGSWAY
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
CROWLEY AVE to ETHEL ST
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
ETHEL ST to GORDON DR
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
KINGSWAY to CAMBRIDGE AVE
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
CENTRAL AVE to CAMBRIDGE AVE
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
WALROD ST to JONES ST
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
BAY AVE to NORTH END OF ROAD
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
CAMBRIDGE AVE to BROADWAY AVE
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
CROWLEY AVE to BAY AVE
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
WEDDELL PL to CROWLEY AVE
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
CROWLEY AVE to GORDON DR
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
TRENCH CT to EAST END OF ROAD
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
JONES ST to TRENCH CT
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
Fenwick Crt 2840 - install sanitary sewer connection and road repair.
Permit number: RUP2024-1135
Project contact: Thomas Scheffer
HWY 97 N to WEST END OF ROAD
December 16, 2024 - 8:00am to December 31, 2024 - 4:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Frost Rd 1003-1111 - emergency Fortis duct repair in grass boulevard on the north east corner of Frost @ Gordon Dr
Permit number: RUP2024-1114
Project contact: Brad Hanks
GORDON DR to STEELE RD
December 5, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Frost Rd 1055 - the project involves constructing a secure pedestrian scaffold tunnel along the sidewalk at the frontage of road.
Permit number: RUP2024-1052
Project contact: Josh Arneson
GORDON DR to STEELE RD
December 2, 2024 - 6:00am to December 31, 2024 - 6:00pm
No Disruption
Gaggin Rd & Gertsmar Rd - pole access and manhole access for cable placing and splicing. No excavation for this work. working on existing infrastructure
Permit number: RUP2024-1154
Project contact: Todd Basso
GAGGIN RD to MORGAN RD
January 9, 2025 - 9:00am to January 10, 2025 - 3:30pm
Single Lane Alternating
TAYLOR RD to GERSTMAR RD
January 9, 2025 - 9:00am to January 10, 2025 - 3:30pm
Single Lane Alternating
Higland Dr N 1515 - big steel box on City road shoulder for moving residential contents
Permit number: RUP2024-1110
Project contact: Alana White
BLONDEAUX CR to WILLOW CR
December 19, 2024 (All day) to January 18, 2025 (All day)
No Disruption
Hilltown Dr 3271 - closing parking lane to create a loading/unloading zone for duration of construction. NO STORAGE OF MATERIAL OR EQUIPMENT IS PERMITED UNDER A TRAFFIC IMPEDANCE PERMIT. IF THIS IS REQUIRED A HOARDING PERMIT WILL BE NEEDED.
Permit number: RUP2024-1105
Project contact: Andrea Del Col
Phone: 778-363-5516
BLUE BUNCH CT to NORTHERN FLICKER CT
December 2, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Hoarding - portion of road.
Permit number: RUP2024-1000
Project contact: Will Monforton
Phone: 250-258-9113
GORDON DR to ASPEN CT
November 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Single Lane Alternating
Holland Rd 3010 - excavating to install shallow utilities.
Permit number: RUP2024-1107
Project contact: Bree Macmullen
Phone: 250-300-3221
KLO RD to NORTH END OF ROAD
December 3, 2024 - 7:00am to December 31, 2024 - 5:00pm
Single Lane Alternating
Joe Rich Rd 2456 - watermain locating for leak detection
Permit number: RUP2024-1157
Project contact: Mathew Poynter
Phone: 250-212-8014
BEGLEY RD to HWY 33 E
December 23, 2024 -
7:00am to 6:00pm
Single Lane Alternating
KLO Bridge Upgrade, Re-locate 3PH Primary Overhead Primary Overhead Line - COK Project. Relocating the OH powerline to the south side of KLIO Rd to accommodate the new bridge construction. Will be installing 9 poles, 16 anchors and removing 6 poles and 5
Permit number: RUP2024-1077
Project contact: Jeff Avila
Phone: 250-212-0959
LEADER RD to SPIERS RD
December 3, 2024 - 9:00am to December 31, 2024 - 3:00pm
Single Lane Alternating
SPIERS RD to HALL RD
December 3, 2024 - 9:00am to December 31, 2024 - 3:00pm
Single Lane Alternating
Lawrence Ave 1131 (Formerly 1605 Gordon Dr) - build 6 story building. Facilitate material drop off without distrubance to traffic on Gordon Dr, the contractor wishes to use the lane currently used for a bus stop and public parking. They will separate th
Permit number: RUP2023-0971
Project contact: Ryan Seddon
Phone: 250-808-4079
GORDON DR to CENTENNIAL CR
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
GORDON DR to CENTENNIAL CR
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Leon Ave 238 / Water St - Climbing crane down and loading out crane sections at the Water St by the Park Project.
Permit number: RUP2024-1144
Project contact: Chris Morneau
Phone: 250-258-5433
LEON AVE to LAWRENCE AVE
January 6, 2025 (All day) to January 12, 2025 (All day)
HARVEY AVE to LEON AVE
January 6, 2025 (All day) to January 12, 2025 (All day)
ABBOTT ST to WATER ST
January 6, 2025 - 7:00am to January 12, 2025 - 5:00pm
Lane Drop - Multi Lane Road
BOYCE CR to HARVEY AVE
January 6, 2025 - 7:00am to January 12, 2025 - 5:00pm
Lane Drop - Multi Lane Road
Leon Ave 278 - off loading and pumping concrete. Deliveries to site. Personnel entering or exiting site. Intermittent.
Permit number: RUP2023-0969
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Leon Ave 278 - usage of partial lane and sidewalk on the north side of Leon Ave bet Abbott & Water St for the construction of the Water Str by the Park Project. Also, used for deliveries and laydown for general construction activities.
Permit number: RUP2024-0548
Project contact: Stephanie Mattson
LEON AVE to LAWRENCE AVE
June 1, 2024 (All day) to December 31, 2024 (All day)
Single Lane Alternating
Leon Ave 278 Hoarding Permit Issued - to show permit in place.
Permit number: RUP2023-0970
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Manhattan Dr 955 - periodic deliveries. Temporary interruptions
Permit number: RUP2024-0895
Project contact: Olaf Nieczyporowicz
MANHATTAN DR to GUY ST
October 8, 2024 - 10:00am to December 31, 2024 - 4:00pm
Local Traffic Only, No Through Traffic, Detour
Noble Crt 1550 - construction trailer on City road shoulder and block sidewalk along west side of Noble Crt. (two way traffic to be maintained) Pedestrians can cross Noble Crt on Bernard Ave and use sidewalk on the East side of Noble Crt
Permit number: RUP2024-0695
Project contact: Joe Reynolds
SOUTH END OF ROAD to BERNARD AVE
July 25, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Noble Crt 1550 - unloading & loading of trucks into site. Sporadic, throughout day. Not constant
Permit number: RUP2024-1136
Project contact: Vicky Bachelder
Phone: 250-801-5930
SOUTH END OF ROAD to BERNARD AVE
December 16, 2024 - 7:00am to January 3, 2025 - 5:00pm
Lane Drop - Multi Lane Road
Pridham Ave & Chandler St - Telus Utility work - pole and service vault access for cable placing and splicing. No excavation for this work - working on existing infrastructure.
Permit number: RUP2024-1155
Project contact: Marley Futerko
Phone: Ext 337
DEVONSHIRE AVE to CHANDLER ST
January 14, 2025 - 9:00am to January 17, 2025 - 3:30pm
Single Lane Alternating
PRIDHAM AVE to BELAIRE AVE
January 14, 2025 - 9:00am to January 17, 2025 - 3:30pm
Single Lane Alternating
Richter St 1875 - use back lane for storage and receiving deliveries on an ongoing basis for construction. Expanding space in back lane from existing permit already in place. New permit issued for expanding area. Both will expire Dec 31, 2024 then can
Permit number: RUP2024-1138
Project contact: Sarb Hayer
DEAD END to ROWCLIFFE AVE
December 12, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Richter St 2609 - site hoarding area for storage of materials (Bike lane not affected. Total area is 55 m2 in area.
Permit number: RUP2024-0065
Project contact: Brigitte Maloney
Phone: 250-769-2395
KINNEAR AVE to WARDLAW AVE
January 15, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Richter St 2609-2611 - install civil Utilities
Permit number: RUP2024-1108
Project contact: Sheilan Laing
Phone: 604-845-6113
KINNEAR AVE to WARDLAW AVE
December 11, 2024 - 9:00am to December 31, 2024 - 3:30pm
Single Lane Alternating
KINNEAR AVE to WARDLAW AVE
December 11, 2024 - 9:00am to December 31, 2024 - 3:30pm
Single Lane Alternating
RICHTER ST to CURTS ST
December 11, 2024 - 9:00am to December 31, 2024 - 3:30pm
Single Lane Alternating
Royal Ave & Long St - laydown and trailer site/seacan placement.
Permit number: RUP2023-0990
Project contact: Brady Allen
LONG ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Lane Drop - Multi Lane Road
LONG ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Lane Drop - Multi Lane Road
Rutland Rd N 169 - one lane and sidewalk closure for material laydown and deliveries/hoisting. A pedestrian provision has been accounted for. Total of 165 sqm of workk zone.
Permit number: RUP2024-0180
Phone: 403-367-1330
HWY 33 W to SHEPHERD RD
May 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Saucier Ave 812 - closure of sidewalk, shoulder and single westbound lane of Saucier Ave. Site hoarding will be for approx 2 years.
Permit number: RUP2023-0987
Project contact: Brodie Scott
RICHTER ST to ETHEL ST
January 1, 2024 - 7:00am to December 31, 2024 - 7:00pm
Single Lane Alternating
Seasonal Permit - all non excavation work on various City streets for 2024.
Permit number: RUP2023-0980
Project contact: Darren Langford
Phone: 250-859-0349
COOPER RD to BENVOULIN CT
January 6, 2025 - 9:00am to January 17, 2025 - 3:00pm
Lane Drop - Multi Lane Road
BENVOULIN CT to BENVOULIN RD
January 6, 2025 - 9:00am to January 17, 2025 - 3:00pm
Lane Drop - Multi Lane Road
St Paul St @ Doyle Ave 550 - pouring and umping concrete
Permit number: RUP2024-1156
Project contact: Scott Spiers
DOYLE AVE to CAWSTON AVE
January 8, 2025 -
6:30am to 4:30pm
Full Road Closure, No Through Traffic, Detour
Sunset Dr 1181 - crane will be hoisting scaffolding materials onto building
Permit number: RUP2024-1139
Project contact: Glen Green
Phone: 250-869-5411
WATER ST to GUY ST
January 8, 2025 -
8:00am to 4:00pm
Single Lane Alternating
Sutherland Ave 1280/Pridham Ave - Sidewalk closure only. Traffic will not be affected at all for the duratiion of this permit. Install of shallow utilities and tie-in off site utilities to complete on Sutherland and Pridham Ave.
Permit number: RUP2024-0681
Phone: 250-300-5093
PRIDHAM AVE to BELAIRE AVE
July 13, 2024 (All day) to December 31, 2024 (All day)
No Disruption
WEST END OF ROAD to DEVONSHIRE AVE
July 13, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Tree Mtce _ Removal - Various City streets. No excavation.
Permit number: RUP2024-0007
Phone: 250-862-0734
SPRUCEGLEN DR to SPRUCEMONT CT
May 30, 2024 - 8:00am to December 31, 2024 - 3:30pm
Continually Moving Work
SPRUCEMONT CT to LIPSETT CT
May 30, 2024 - 8:00am to December 31, 2024 - 3:30pm
Continually Moving Work
Underhill St & Baron Rd - closure of the sidewalk and bike lane on Baron Rd to accommodate construction. cyclists and peds will have signed detour route. Crosswalk to be setup on Underhill.
Permit number: RUP2024-1159
Project contact: Esther Elechi
DILWORTH DR to UNDERHILL ST
January 20, 2025 (All day) to December 31, 2025 (All day)
No Disruption
HAYNES RD to BARON RD
January 20, 2025 (All day) to December 31, 2025 (All day)
No Disruption
Water Main Repairs 2024 - Various City Streets
Permit number: RUP2024-0050
Project contact: Jens Petersen
Phone: 250-469-8424
GOODISON RD to JUNE SPRINGS RD
November 25, 2024 - 11:00am to December 26, 2024 - 3:00pm
Single Lane Alternating
Water St 1580 & 1570 - Demolish building and construct new building. Hoarding required on Lawrence, lane and Water St
Permit number: RUP2024-0068
Project contact: Slava Korshunov
ABBOTT ST to WATER ST
January 1, 2024 - 8:00am to December 31, 2024 - 4:00pm
Lane Drop - Multi Lane Road
LAWRENCE AVE to LANE
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Water St 1659 / Leon Ave - errect scafolding to close portion of walkway at the corner to work on building.
Permit number: RUP2024-0008
Project contact: Thomas Scheffer
Phone: 778-214-7214
WATER ST to PANDOSY ST
January 5, 2024 (All day) to December 31, 2024 (All day)
No Disruption
HARVEY AVE to LEON AVE
January 5, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Water St @ 238 Leon Ave - road closure on Water St (Harvey to Laneway bet Lawrence & Leon Ave) for crane activity. Removing tower crane
Permit number: RUP2024-1145
Project contact: Chris Morneau
Phone: 250-258-5433
LEON AVE to LAWRENCE AVE
January 11, 2025 - 7:00am to January 12, 2025 - 5:00pm
Full Road Closure, No Through Traffic, Detour
HARVEY AVE to LEON AVE
January 11, 2025 - 7:00am to January 12, 2025 - 5:00pm
Full Road Closure, No Through Traffic, Detour