Demobilization of 70ft Crawler crane and man lift from excavation with 270 mobile crane. Current closure is for 3 days, however, expectation is to expedite demobilization and shrink closure duration if possible.

Home > Roads & Transportation > Roads & sidewalks > Road report > Rup2025 0060 > Demobilization of 70ft Crawler crane and man lift from excavation with 270 mobile crane. Current closure is for 3 days, however, expectation is to expedite demobilization and shrink closure duration if possible.
DOYLE AVE
From: ST PAUL ST...
To: BERTRAM ST...
Full Road Closure, No Through Traffic, Detour