Road report

Road information is based on issued road usage permits. All public and private contractors are required to obtain a road usage permit for work affecting traffic flow. Click on a coloured line on the map for details about traffic impacts. 

Subscribe to road report e-updates  

Permit number: RUP2023-0983
Project contact: Raquel Dusseault
BERNARD AVE to DOYLE AVE
January 1, 2024 (All day) to July 1, 2024 (All day)
Lane Drop - Multi Lane Road
BERNARD AVE to DOYLE AVE
January 1, 2024 - 7:00am to July 1, 2024 - 4:00pm
Lane Drop - Multi Lane Road
Permit number: RUP2024-0430
Project contact: Brian Peters250-863-9921
WINSLOW ST to TULAMEEN RD
June 21, 2024 (All day) to July 2, 2024 (All day)
No Disruption
Permit number: RUP2024-0041
Project contact: Craig Donoghue
Phone: 250-487-8102
SOUTH END OF ROAD to WALNUT ST
January 1, 1900 (All day) to December 31, 2024 (All day)
(Lane) 550 Doyle Ave - bailing of granular material from alleyway be excavator to backfill against the alley side shoring wall per requirement of the City of Kelowna
Permit number: RUP2024-0272
Project contact: Scott Speirs
Phone: 204-232-9781
DOYLE AVE to CAWSTON AVE
March 21, 2024 (All day) to October 1, 2024 (All day)
Local Traffic Only, No Through Traffic, Detour
2024 Paving Season - various City Streets. Adjustment of manholes and water valves, milling & paving through the pavement management program.
Permit number: RUP2024-0341
Project contact: Kristel Dodaro
CLARANCE AVE to FROST RD
July 3, 2024 - 7:00am to July 4, 2024 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
SOUTH PERIMETER WAY to PONDS AVE
July 3, 2024 - 7:00am to July 4, 2024 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
PONDS AVE to CLARANCE AVE
July 3, 2024 - 7:00am to July 4, 2024 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
2024 Seasonal Permit - concrete pour. Pump truck will block road access on Dougal Rd on selected days only. Road will be unobstructed on majority of days otherwise. Set up time 6 am but will not start pouring till 7 am
Permit number: RUP2024-0227
SHEPHERD RD to MCINTOSH RD
January 1, 1900 (All day) to December 31, 2024 (All day)
3377 Lakeshore Rd - Lakeshore Rd 3477 & Richter - deliveries, concrete pours etc for this project.
Permit number: RUP2023-0989
Project contact: Taija Jagodnik
SWORDY RD to RICHTER ST
January 1, 2024 - 7:00am to August 31, 2024 - 6:00pm
Lane Drop - Multi Lane Road
Abbott St 3061-3095 - install storm main system along with the sanitary and water connections that come off of Abbott St and Cedar Ave
Permit number: RUP2024-0403
Project contact: Sheilan Laing
Phone: 604-845-6113
MEIKLE AVE to NEWSOM AVE
May 2, 2024 - 7:00am to July 30, 2024 - 4:30pm
Single Lane Alternating
ABBOTT ST to PANDOSY ST
May 2, 2024 - 7:00am to July 30, 2024 - 4:30pm
Single Lane Alternating
Appaloosa Rd 3226 & 3256 - water, sewer and storm install. Paving and frontage improvements to be completed for this stretch.
Permit number: RUP2024-0460
Project contact: Ben Jollymore
Phone: 604-312-6677
ACADEMY WAY to PINTO RD
May 28, 2024 - 7:00am to July 28, 2024 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Appaloosa Rd 3256 - Utility trailer partially on City road shoulder. No traffic interruptions.
Permit number: RUP2024-0237
Project contact: Liam Gibson
ACADEMY WAY to PINTO RD
March 22, 2024 (All day) to December 31, 2024 (All day)
No Disruption
ACADEMY WAY to PINTO RD
March 22, 2024 (All day) to December 31, 2024 (All day)
Belaire 1365 - concrete pour
Permit number: RUP2024-0578
Project contact: Maira Loosemore
Phone: 250-808-9330
DEVONSHIRE AVE to CHANDLER ST
July 12, 2024 -
6:00am to 2:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Belaire 1365 / Chandler St 1840 & 1850 - use of frontage including sidewalk for site office, garage disposal C-can, loading and unloading of trucks. Site is fully fenced.
Permit number: RUP2024-0056
Project contact: Clayton Unruh
Phone: 778-215-1187
DEVONSHIRE AVE to CHANDLER ST
January 1, 2024 (All day) to August 31, 2024 (All day)
No Disruption
Belaire Ave 1365 - concrete pours (3)
Permit number: RUP2024-0523
Project contact: Mike Partington
Phone: 250-808-9330
DEVONSHIRE AVE to CHANDLER ST
July 12, 2024 -
6:00am to 4:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Benvoulin Crt 21365/Benvoulin Rd 2175/Mayer Rd - extension of Mayer Rd bet Benvoulin Crt /Rd. Install storm service along new section of Mayer Rd, drywell install in new section of Mayer Rd. Curb, sidewalk install in new section. Relocate crosswalk sign
Permit number: RUP2024-0211
Project contact: Ryan
Phone: 250-718-5922
SOUTH END OF ROAD to SPRINGFIELD RD
June 15, 2024 - 9:00am to June 30, 2024 - 3:30pm
Lane Drop - Multi Lane Road
COOPER RD to MAYER RD
June 15, 2024 - 9:00am to June 30, 2024 - 3:30pm
Lane Drop - Multi Lane Road
MAYER RD to SPRINGFIELD RD
June 15, 2024 - 9:00am to June 30, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Benvoulin Rd 2175 - facilitate water service decommission. Single right hand southbound lane closure on Benvoulin
Permit number: RUP2024-0592
Project contact: Norm Stewart
MAYER RD to SPRINGFIELD RD
July 2, 2024 - 9:00am to July 5, 2024 - 1:30pm
Lane Drop - Multi Lane Road
MAYER RD to SPRINGFIELD RD
July 2, 2024 (All day) to July 5, 2024 (All day)
Benvoulin Rd 2175 @ 2165 Benvoulin Crt dewatering and sanitary tie-in - June 27 7am - 5pm Benvoulin reduced to one lane north and southbound. Traffic will be pushed to the northbound lanes. Southbound lanes closed for well point installation. Steel r
Permit number: RUP2024-0533
Project contact: Ryan Nojonen
COOPER RD to MAYER RD
July 2, 2024 - 7:00am to July 4, 2024 - 7:00pm
Lane Drop - Multi Lane Road
COOPER RD to MAYER RD
June 27, 2024 (All day) to July 4, 2024 (All day)
Bernard Ave 327 - Install sign. we need a sidewalk permit for Bernard Ave, this work will be completed on one of the 3 days, not all of them. The road is closed so we will just barricade off the area we are working in once we are set up. Foot traffic ca
Permit number: RUP2024-0612
Project contact: Thomas Scott Signcraft
WATER ST to PANDOSY ST
July 9, 2024 - 9:00am to July 10, 2024 - 2:00pm
No Disruption
Bertram St (Leon to Harvey Ave ) NB & SB - construction of the north ramp overpass. Works include asphalt, landscaping, concrete removal, deep and shallow foundation work, construction of an ongrade and suspended concrete ramp structure.
Permit number: RUP2024-0141
Project contact: Zane Weal
Phone: 40.3-585-7055
HARVEY AVE to LEON AVE
March 4, 2024 - 7:00am to November 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Bertram St 1333 - water, sanitary & storm disconnect and install
Permit number: RUP2024-0518
Project contact: Rob Desjardins
Phone: 250-826-8876
FULLER AVE to CAWSTON AVE
June 10, 2024 - 7:00am to July 12, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Bertram St 1333 - Breezeway install along sidewalk infront of address. Will allow edestrians to use the sidewalk without construction impedance. Office on top of breezeway.
Permit number: RUP2024-0575
Project contact: Levi Maximick
Phone: 236-597-7520
FULLER AVE to CAWSTON AVE
August 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Bertram St 1333 - Install Fortis Conduit. Trenching along alley infront of 1310 Bertram St. Closing alley while trench and flaggers when crossing Bertram St
Permit number: RUP2024-0509
Project contact: Brad Hanks
FULLER AVE to CAWSTON AVE
June 10, 2024 - 8:00am to July 12, 2024 - 5:00pm
Lane Drop - Multi Lane Road
BERTRAM ST to LANE
June 10, 2024 - 8:00am to July 12, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Bertram St 1333 - lay down area for construction material
Permit number: RUP2024-0432
Project contact: Levi Maximick
Phone: 236-597-7520
FULLER AVE to CAWSTON AVE
May 27, 2024 (All day) to July 1, 2024 (All day)
No Disruption
BERTRAM ST to LANE
May 27, 2024 (All day) to July 1, 2024 (All day)
No Disruption
BERTRAM ST to LANE
July 2, 2024 (All day) to August 6, 2024 (All day)
No Disruption
FULLER AVE to CAWSTON AVE
July 2, 2024 (All day) to August 6, 2024 (All day)
No Disruption
Bertram St 1333 - require 2 hour parking stalls directly outside of our construction site to be closed.
Permit number: RUP2024-0488
Project contact: Levi Maximick
Phone: 236-597-7520
FULLER AVE to CAWSTON AVE
June 3, 2024 (All day) to August 6, 2024 (All day)
No Disruption
FULLER AVE to CAWSTON AVE
June 3, 2024 (All day) to July 2, 2024 (All day)
No Disruption
Bertram St @ 560 Bernard Ave - place fencing along Bertram St for storage of waste container and tool trailer. There will be no impediment to traffic. Obstructions will be in the parking stalls. Parking passes required thru Kelowna Park. Advised Carme
Permit number: RUP2024-0603
Project contact: Raquel Dusseault
BERNARD AVE to DOYLE AVE
June 26, 2024 (All day) to July 26, 2024 (All day)
No Disruption
Boynton Pl 630 - parking space and sidewalk use for construction in area.
Permit number: RUP2024-0023
Project contact: Thomas Leney
Phone: 236-878-9113
HIGHPOINTE DR to CARAMILLO RD
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Boynton Pl 630 - we are currently looking to obtain a temporary ‘No Parking permit’ in the below shown existing parking lot, up until the end of August 2024, as we required truck access closer to the ongoing B1(Phase 01) construction.
Permit number: RUP2024-0576
Project contact: Tanner Brockman
Phone: 306-231-3771
HIGHPOINTE DR to CARAMILLO RD
June 20, 2024 (All day) to August 31, 2024 (All day)
No Disruption
Capozzi Rd 3838 / Truswell - Truswell hoarding permit to accommodate our frontage improvements. TMP is in place from previous permits.
Permit number: RUP2024-0012
Project contact: Luca Salis
Phone: 403-703-7192
CAPOZZI RD to COOK RD
January 1, 2024 - 7:00am to June 30, 2024 - 9:00pm
No Disruption
Cara Glen Court 1455 - Debri bins and equipment parked on City road shoulder for construction underway. 3 parking stalls only will be included with this permit.
Permit number: RUP2023-0976
Project contact: Joe Brown
SOUTH END OF ROAD to CARA GLEN WAY
June 2, 2024 (All day) to August 31, 2024 (All day)
No Disruption
Cara Glen Crt 1430 - Site office trailer parked on City street. Using approx 3 parking stalls. 67 sq meters
Permit number: RUP2024-0028
Project contact: Justin Law
SOUTH END OF ROAD to CARA GLEN WAY
April 1, 2024 (All day) to July 31, 2024 (All day)
No Disruption
Cara Glen Crt 1430 - occupy approx 4 - 5 parking stalls for office trailer. This is in addition to the Hoarding Permit they have in place already.
Permit number: RUP2024-0539
Project contact: Justin Law
SOUTH END OF ROAD to CARA GLEN WAY
June 15, 2024 (All day) to August 30, 2024 (All day)
No Disruption
Chandler 1840/Pridham 1380/Chandler - install storm, sani, Fortis Elect & Fortis Street Lights
Permit number: RUP2024-0540
Project contact: Garrett Rutten
Phone: 250-328-4884
DEVONSHIRE AVE to CHANDLER ST
June 14, 2024 - 7:00am to July 14, 2024 - 7:00pm
Single Lane Alternating
DEVONSHIRE AVE to CHANDLER ST
June 14, 2024 - 7:00am to July 14, 2024 - 7:00pm
Single Lane Alternating
DEVONSHIRE AVE to CHANDLER ST
June 14, 2024 (All day) to July 12, 2024 (All day)
DEVONSHIRE AVE to CHANDLER ST
June 28, 2024 (All day) to July 3, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
DEVONSHIRE AVE to CHANDLER ST
June 14, 2024 (All day) to July 12, 2024 (All day)
SUTHERLAND AVE to PRIDHAM AVE
June 14, 2024 (All day) to July 12, 2024 (All day)
PRIDHAM AVE to BELAIRE AVE
June 14, 2024 (All day) to July 12, 2024 (All day)
BELAIRE AVE to HARVEY AVE
June 14, 2024 (All day) to July 12, 2024 (All day)
Clement Ave 647 Eastbound - hauling rock for soil densification. Hauling away earth during bulk excavation in concrete for the foundatiion.
Permit number: RUP2024-0492
Project contact: Jeff Van Leenen
ST PAUL ST to RICHTER ST
May 31, 2024 - 7:00am to September 25, 2024 - 6:00pm
No Disruption
Comment:Abbott St 3061/Cedar Ave - extend construction fencing to the edge of the roadway to allow for a safer work area for site personnel as well as the general public. Ongoing construction of an 87 unit wood frame, 7 story building.
Permit number: RUP2023-0972
Project contact: Gary Klassen/Kanina Wright
Phone: 250-448-8810
MEIKLE AVE to NEWSOM AVE
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
ABBOTT ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
Coronation Ave (Richter to Ethel) - removal of old a/c sewer, install of new sewer, pave prep and paving from Richter St to Thel St along Coronation Ave resulting in a full road closure City of Kelowna project, homeowner notices and signs will be posted a
Permit number: RUP2024-0550
Project contact: Felix Menu
Phone: 250-765-0330
RICHTER ST to ETHEL ST
June 24, 2024 (All day) to October 31, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Crossridge Cr 233 - domestic water service renewal
Permit number: RUP2024-0616
Project contact: Kevin Burtch
Phone: 250-868-7096
MOUBRAY RD to BIGGAR RD
July 3, 2024 -
8:00am to 3:30pm
Single Lane Alternating
Dehart Rd 659 - Excavation on Dehart Rd to facilitate utility upgrades and service connections to Dehart Community Park Construction. Regarding and asphalt surface upgrades to Dehart Rd for new boulevard, sidewalk and multi-use pathway, landscaping and l
Permit number: RUP2024-0484
Project contact: James Wainwright
Phone: 1-250-469-3619
SARSONS RD to GORDON DR
June 15, 2024 - 9:00am to September 28, 2024 - 3:30pm
Continually Moving Work
SARSONS RD to GORDON DR
July 2, 2024 - 9:00am to August 31, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Devonshire Ave 1274 - Deliveries and any traffic interruptions.
Permit number: RUP2024-0026
Project contact: Marlon Kotter
Phone: 250-300-5093
PRIDHAM AVE to BELAIRE AVE
January 1, 2024 (All day) to August 31, 2024 (All day)
Lane Drop - Multi Lane Road
Dougall Rd N 540 - staging area to facilitate construction of 124 unit residential rental building. Site Trailer
Permit number: RUP2024-0047
Project contact: Zach Ireland
Phone: 226-979-5075
MCINTOSH RD to LEATHEAD RD
June 2, 2024 (All day) to July 30, 2024 (All day)
No Disruption
Doyle Ave 550 / St Paul St- Jersey barrier set up along alley, Doyle Ave and St Paul for public safety from construction traffic and future excavation
Permit number: RUP2023-0973
Project contact: Lauren Cooper
ST PAUL ST to BERTRAM ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Ellis St 1144 (One Water St) - asphalt patch repair. Work will involve SB bike lane closure. Work is a deficiency from One Water St works in 2022. Patch will be prepared on Tue July 2 and asphalt placed on Wed July 3. No traffic interruption, hence 7
Permit number: RUP2024-0614
Project contact: Garret Rutten
Phone: 250-328-4884
CLEMENT AVE to GASTON AVE
July 2, 2024 - 7:00am to July 3, 2024 - 5:00pm
No Disruption
Ellis St 1331 - painting exterior of buildings. Scissor lift on City Parking Spaces. Will purchase parking passes for stalls they will be using
Permit number: RUP2024-0577
Project contact: Brock
Phone: 250-300-5939
DOYLE AVE to CAWSTON AVE
June 24, 2024 - 8:00am to July 5, 2024 - 5:00pm
No Disruption
Enterprise Way ( Cooper to Dilwroth Dr) - Charity Event Detour thru Hwy 97 (Harvey). Fees waived for Charity Event
Permit number: RUP2024-0084
Project contact: Maxine Dehart United Way Breakfast
Phone: 250-862-7662
COOPER RD to DILWORTH DR
October 17, 2024 -
5:00am to 9:00am
Local Traffic Only, No Through Traffic, Detour
Ethel St 1863 (Lane) - install Telus conduit and place Telus manhole. Lane closure signs to be posted in lane. Notifications to be sent to affected residents.
Permit number: RUP2024-0602
Project contact: Peter McLonghlin
SUTHERLAND AVE to BORDEN AVE
July 8, 2024 - 7:30am to July 10, 2024 - 4:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Fortis Seasonal Permit - all overhead works. No excavation work only. Various City Streets
Permit number: RUP2024-0005
Project contact: Dustin Bates
Phone: 250-717-0828
SCHAMERHORN CT to FAVELL CT
July 2, 2024 -
9:00am to 3:00pm
Single Lane Alternating
POOLEY RD to EAST KELOWNA RD
July 10, 2024 -
9:00am to 3:00pm
Single Lane Alternating
HUGHES RD to KAMLOOPS RD
July 5, 2024 (All day)
Single Lane Alternating
RICHMOND ST to THAYER CT
July 11, 2024 -
8:00am to 3:00pm
Single Lane Alternating
Fortis Weekly Service Installs - July 2 to July 5th
Permit number: RUP2024-0615
Project contact: Thomas Abenante
Phone: 250-868-4518
HUBBARD RD to BULLOCK RD
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to SHERWOOD RD
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
SIMEON CT to HOBSON RD
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
RICHTER ST to LANFRANCO RD
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
RICHTER ST to ETHEL ST
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
SUTHERLAND AVE to BORDEN AVE
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
GORDON DR to CAPRI ST
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
WEST END OF ROAD to LILLOOET CR
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
SHAYLER RD to NORTH END OF ROAD
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
KINGSWOOD TERR to NORTH END OF ROAD
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
PEARCY CT to EMSLIE ST
July 2, 2024 - 7:00am to July 5, 2024 - 5:00pm
Lane Drop - Multi Lane Road
Frost Rd E&W Bound & Gordon Dr N&S Bound - re-align curb, install underground utilities to facilitate new traffic signals, install new concrete islands, adjust existing CB's to new road alignment.
Permit number: RUP2024-0268
Project contact: Merrick Hill
Phone: 250-859-5355
FROST RD to STEELE RD
June 16, 2024 - 9:00am to July 26, 2024 - 3:30pm
Single Lane Alternating
SOUTH RIDGE DR to GORDON DR
June 16, 2024 - 7:00am to July 26, 2024 - 5:00pm
Single Lane Alternating
GORDON DR to STEELE RD
June 16, 2024 - 7:00am to July 26, 2024 - 5:00pm
Single Lane Alternating
CLARANCE AVE to FROST RD
June 16, 2024 - 9:00am to July 26, 2024 - 3:30pm
Single Lane Alternating
GORDON DR to FROST RD
June 16, 2024 - 9:00am to July 26, 2024 - 3:30pm
Single Lane Alternating
SOUTH RIDGE DR to GORDON DR
June 16, 2024 - 7:00am to July 26, 2024 - 5:00pm
Single Lane Alternating
GORDON DR to STEELE RD
June 16, 2024 - 7:00am to July 26, 2024 - 5:00pm
Single Lane Alternating
Gaggin Rd 1220 - new water service across Gaggin Rd
Permit number: RUP2024-0598
Project contact: Steve
Phone: 250-870-6596
TAYLOR RD to GERSTMAR RD
July 3, 2024 -
7:30am to 3:00pm
Single Lane Alternating
Glenmore ATC Extension = Yates to Dallas
Permit number: RUP2024-0584
Project contact: Allan Sirett
Phone: 250-870-7861
YATES RD to BALLOU PL
June 28, 2024 - 7:00am to August 10, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
YATES RD to BALLOU PL
June 28, 2024 (All day) to August 10, 2024 (All day)
Single Lane Alternating
BALLOU PL to MCTAVISH CR
June 28, 2024 (All day) to August 10, 2024 (All day)
Single Lane Alternating
BALLOU PL to MCTAVISH CR
June 28, 2024 - 7:00am to August 10, 2024 - 5:00pm
Lane Drop - Multi Lane Road
BALLOU PL to KANE RD
June 28, 2024 (All day) to August 10, 2024 (All day)
Single Lane Alternating
MCTAVISH CR to MCTAVISH CR
June 28, 2024 (All day) to August 10, 2024 (All day)
Single Lane Alternating
MCTAVISH CR to MCTAVISH CR
June 28, 2024 - 7:00am to August 10, 2024 - 5:00pm
Lane Drop - Multi Lane Road
BALLOU RD to DALLAS RD
June 28, 2024 (All day) to August 10, 2024 (All day)
Single Lane Alternating
BALLOU RD to DALLAS RD
June 28, 2024 - 7:00am to August 10, 2024 - 5:00pm
Lane Drop - Multi Lane Road
MCTAVISH CR to DALLAS RD
June 28, 2024 (All day) to August 10, 2024 (All day)
Single Lane Alternating
MCTAVISH CR to DALLAS RD
June 28, 2024 - 7:00am to August 10, 2024 - 5:00pm
Lane Drop - Multi Lane Road
Glenmore Rd (bet Cross & Union) - milling pavement, excavation of pavement, trenching. Install of new sanitary amin, use of trench shields, backfilling trench using robot roller. Pavement reinstatement, nuclear densometer testing, asphalt surfacing, con
Permit number: RUP2024-0567
Project contact: Vahid Ghazizodeh
Phone: 250-878-6114
CROSS RD to UNION RD
September 2, 2024 - 7:00am to September 20, 2024 - 7:00pm
Full Road Closure, Lane Drop - Multi Lane Road
CROSS RD to UNION RD
June 24, 2024 - 7:00am to August 19, 2024 - 7:00pm
Full Road Closure, Lane Drop - Multi Lane Road
CROSS RD to UNION RD
August 13, 2024 - 7:00am to August 16, 2024 - 7:00pm
Lane Drop - Multi Lane Road
Gordon Dr (Frost Rd to South Perimeter Way) - adjust manholes and water valves, milling & paving various roads through the pavement management program.
Permit number: RUP2024-0610
Project contact: Kristel Dodaro
PONDS AVE to CLARANCE AVE
July 3, 2024 - 7:00am to July 4, 2024 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
CLARANCE AVE to FROST RD
July 3, 2024 - 7:00am to July 4, 2024 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
SOUTH PERIMETER WAY to PONDS AVE
July 3, 2024 - 7:00am to July 4, 2024 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Gordon Dr 4553 - here is a permit request for a full road closure on Gordon dr. I spoke to stu evans last week about it and got all the details from him about the “how to”. If anything is missing please reach out to doug m @ 7782144571 Remove dange
Permit number: RUP2024-0596
Project contact: Douglas Meszaros
Phone: 778-214-4571
HARMONY CT to RAYMER RD
July 6, 2024 -
6:00am to 3:00pm
Full Road Closure, No Through Traffic, Detour
Highland Dr N 1701 - big steel box on City road shoulder. Moving into new home.
Permit number: RUP2024-0608
Project contact: Jed Herrick
SOUTH END OF ROAD to LITTLE AVE
September 3, 2024 (All day) to October 1, 2024 (All day)
No Disruption
Lapointe Dr 6028 - install storm sewer services into mainline. Short road has entrances on both end. No one will be affected as far as traffic ut they will be digging across the road.
Permit number: RUP2024-0529
Project contact: Jason Bennett
Phone: 870-2405
SOUTH END OF ROAD to AIRPORT WAY
June 12, 2024 - 7:00am to July 10, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Lane Drop - Multi Lane Road
Lawrence Ave 1131 (Formerly 1605 Gordon Dr) - build 6 story building. Facilitate material drop off without distrubance to traffic on Gordon Dr, the contractor wishes to use the lane currently used for a bus stop and public parking. They will separate th
Permit number: RUP2023-0971
Project contact: Ryan Seddon
Phone: 250-808-4079
GORDON DR to CENTENNIAL CR
January 1, 2024 - 7:00am to October 31, 2024 - 7:00pm
Lane Drop - Multi Lane Road
GORDON DR to CENTENNIAL CR
January 1, 2024 - 7:00am to October 31, 2024 - 7:00pm
Lane Drop - Multi Lane Road
Leckie ATC / Dilworth Dr - extension from Okanagan Rail Trail to the Mission Park Greenway along the north side of Leckie Rd. See attached maps.
Permit number: RUP2024-0321
Project contact: Rob Reitman
Phone: 250-862-6720
HUNTER RD to ENTERPRISE WAY
April 15, 2024 - 7:00am to October 31, 2024 - 5:30pm
Full Road Closure, No Through Traffic, Detour
ENTERPRISE WAY to HWY 97 N
April 15, 2024 - 7:00am to October 31, 2024 - 5:30pm
Lane Drop - Multi Lane Road
ENTERPRISE WAY to HWY 97 N
April 19, 2024 - 7:00am to October 19, 2024 - 5:30pm
Lane Drop - Multi Lane Road
Leckie Rd @ Hwy 97 - Transformer repair. No outage scheduled
Permit number: RUP2024-0606
Phone: 778-900-4575
ENTERPRISE WAY to HWY 97 N
July 5, 2024 - 8:00am to July 7, 2024 - 5:00pm
Lane Drop - Multi Lane Road
ENTERPRISE WAY to HWY 97 N
July 7, 2024 -
5:00am to 5:00pm
Lane Drop - Multi Lane Road
Leon Ave 278 - off loading and pumping concrete. Deliveries to site. Personnel entering or exiting site. Intermittent.
Permit number: RUP2023-0969
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Leon Ave 278 - usage of partial lane and sidewalk on the north side of Leon Ave bet Abbott & Water St for the construction of the Water Str by the Park Project. Also, used for deliveries and laydown for general construction activities.
Permit number: RUP2024-0548
Project contact: Stephanie Mattson
LEON AVE to LAWRENCE AVE
June 1, 2024 (All day) to December 31, 2024 (All day)
Single Lane Alternating
Leon Ave 278 Hoarding Permit Issued - to show permit in place.
Permit number: RUP2023-0970
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Leon Ave 310 - close down sidewalk around building to set up scaffolding to install siding. Divert pedestrians into parking stalls. Will pay for parking stalls also. See attached plan.
Permit number: RUP2024-0569
Project contact: Vic Vachon
WATER ST to PANDOSY ST
June 24, 2024 - 7:00am to July 19, 2024 - 4:30pm
No Disruption
McClure 634 - install offsite shallow utilities Fortis , Telus & Shaw
Permit number: RUP2024-0582
Project contact: Ricky Sekhon
Phone: 604-518-8000
NEEDHAM CT to BONJOU RD
June 27, 2024 (All day) to July 2, 2024 (All day)
Single Lane Alternating
McCurdy Rd E 712/Lacombe - install 2 sanitary manholes on McCurdy Rd E (eastbound lane), install sanitary piping plus tie into existing manhole on Lacombe Rd. Will include concrete sidewalk closure,curbing removal and restoration after utility is install
Permit number: RUP2024-0560
Project contact: Dan Podmorow
Phone: 778-215-1649
MCCURDY RD E to SUMAC RD E
June 25, 2024 - 7:00am to July 12, 2024 - 6:00pm
Single Lane Alternating
LACOMBE RD to MORRISON RD
June 25, 2024 - 7:00am to July 12, 2024 - 6:00pm
Lane Drop - Multi Lane Road
Moubray Rd 297 - domestic water service renewal
Permit number: RUP2024-0617
Project contact: Kevin Burtch
Phone: 250-868-7096
DALLAS RD to COSENS CT
July 2, 2024 -
8:00am to 3:30pm
Single Lane Alternating
Portview Ave 150 - install water & sanitary services to 3 buildings lots. Remove curb & repour. Fix asphalt where necessary.
Permit number: RUP2024-0593
Project contact: Jason
PORTVIEW CT to PORTHILL DR
June 11, 2024 - 7:00am to July 31, 2024 - 5:00pm
No Disruption
Pridham 1267 & 1319 Pridham & 1304 Devonshire - install Fortis utilities, Fortis power pole removal, install storm sewer drywells and piping. Removal and reinstatement of sidewalks, curbing, water line- residential service decommissioning, segment replac
Permit number: RUP2024-0535
Project contact: Dan Podmorow
Phone: 778-215-1649
WEST END OF ROAD to DEVONSHIRE AVE
June 14, 2024 - 7:00am to July 3, 2024 - 6:00pm
Single Lane Alternating
PRIDHAM AVE to BELAIRE AVE
June 14, 2024 - 7:00am to July 3, 2024 - 6:00pm
Single Lane Alternating
WEST END OF ROAD to DEVONSHIRE AVE
June 14, 2024 (All day) to July 3, 2024 (All day)
PRIDHAM AVE to BELAIRE AVE
June 14, 2024 (All day) to July 3, 2024 (All day)
Queensway Ave West(Infront of Clock Tower) - repair 2 sets of concrete steps on either side of clock tower.
Permit number: RUP2024-0590
Project contact: Teresa Sommerfeld
Phone: 250-470-8408
WATER ST to PANDOSY ST
July 2, 2024 - 7:00am to July 15, 2024 - 3:00pm
Single Lane Alternating
Raymer Ave Watermain Upgrade (Gordon to just past Mappin Ct) - install new watermain
Permit number: RUP2024-0599
Project contact: Steve Neetz
ETHEL ST to MAPPIN CT
July 2, 2024 - 7:00am to August 30, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
MAPPIN CT to GOSNELL RD
July 2, 2024 - 7:00am to August 30, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
GOSNELL RD to BOUVETTE ST
July 2, 2024 - 7:00am to August 30, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
BOUVETTE ST to GORDON DR
July 2, 2024 - 7:00am to August 30, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
Renshaw Rd 726 - install Rogers conduit from existing vault to private property line.
Permit number: RUP2024-0595
Project contact: Hailey Schmidt
PEARSON RD to HOLLYWOOD RD N
July 3, 2024 - 9:00am to July 4, 2024 - 4:00pm
No Disruption
Richter St 2609 - site hoarding area for storage of materials (Bike lane not affected. Total area is 55 m2 in area.
Permit number: RUP2024-0065
Project contact: Brigitte Maloney
Phone: 250-769-2395
KINNEAR AVE to WARDLAW AVE
January 15, 2024 - 7:00am to October 15, 2024 - 3:00pm
Single Lane Alternating
Royal Ave & Long St - laydown and trailer site/seacan placement.
Permit number: RUP2023-0990
Project contact: Brady Allen
LONG ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Lane Drop - Multi Lane Road
Royal Ave 4165 - water tie-in, water, sanitary disconnects , gutter, sidewalk and paving. Working with Metric Civil at some point. Working together
Permit number: RUP2024-0519
Project contact: Randy Smith
Phone: 250-826-8876
LONG ST to PANDOSY ST
June 17, 2024 - 7:00am to July 5, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Rutland Rd N 169 - one lane and sidewalk closure for material laydown and deliveries/hoisting. A pedestrian provision has been accounted for. Total of 165 sqm of workk zone.
Permit number: RUP2024-0180
Phone: 403-367-1330
HWY 33 W to SHEPHERD RD
May 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Rutland Sewer North East Phase 1 - Prior Rd S (starting on this road), Robson Rd E, Dillman Rd, Holbrook Rd E, Spartan Rd, Mallach Rd, Jade Rd and Scaraboro Rd Install sanitary sewer
Permit number: RUP2024-0347
Project contact: Rob Reitman
Phone: 250-862-6720
ROBSON RD W to HWY 33 E
April 22, 2024 - 7:00am to October 31, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
HOLBROOK RD E to ROBSON RD W
April 22, 2024 - 7:00am to October 31, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Saucier Ave 812 - closure of sidewalk, shoulder and single westbound lane of Saucier Ave. Site hoarding will be for approx 2 years.
Permit number: RUP2023-0987
Project contact: Brodie Scott
RICHTER ST to ETHEL ST
January 1, 2024 - 7:00am to December 31, 2024 - 7:00pm
Single Lane Alternating
Seasonal Permit - all non excavation work on various City streets for 2024.
Permit number: RUP2023-0980
Project contact: Darren Langford
Phone: 250-859-0349
MATRIX CR to LOCHREM RD
July 2, 2024 - 8:00am to July 5, 2024 - 3:00pm
Lane Drop - Multi Lane Road
MATRIX CR to MATRIX CR
July 2, 2024 - 8:00am to July 5, 2024 - 3:00pm
Lane Drop - Multi Lane Road
AIRPORT WAY to CIRCUIT RD
July 2, 2024 - 8:00am to July 5, 2024 - 3:00pm
Lane Drop - Multi Lane Road
CIRCUIT RD to KEL MAC CT
July 2, 2024 - 8:00am to July 5, 2024 - 3:00pm
Lane Drop - Multi Lane Road
KEL MAC CT to MATRIX CR
July 2, 2024 - 8:00am to July 5, 2024 - 3:00pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to CARA GLEN WAY
June 21, 2024 - 8:00am to August 5, 2024 - 4:00pm
Lane Drop - Multi Lane Road
CLIFTON RD to EAST END OF ROAD
June 21, 2024 - 8:00am to August 5, 2024 - 4:00pm
Lane Drop - Multi Lane Road
Springfield Rd 2241 Benvoulin Rd & Benvoulin Crt - work totally off road behind curb. No traffic interruptions so asking for 7 am start for install of Fortis & Shaw.
Permit number: RUP2024-0307
Project contact: Steve
Phone: 250-870-4549
SOUTH END OF ROAD to SPRINGFIELD RD
July 2, 2024 - 7:00pm to July 5, 2024 - 7:00am
Lane Drop - Multi Lane Road
BENVOULIN CT to BENVOULIN RD
July 6, 2024 - 9:00am to July 19, 2024 - 3:00pm
Lane Drop - Multi Lane Road
MAYER RD to SPRINGFIELD RD
July 8, 2024 - 7:00am to July 19, 2024 - 5:00pm
No Disruption
COOPER RD to BENVOULIN CT
July 8, 2024 - 7:00am to July 19, 2024 - 5:00pm
No Disruption
BENVOULIN CT to BENVOULIN RD
July 6, 2024 - 7:00am to July 19, 2024 - 5:00pm
No Disruption
BENVOULIN CT to BENVOULIN RD
July 2, 2024 - 7:00pm to July 5, 2024 - 7:00am
Lane Drop - Multi Lane Road
COOPER RD to BENVOULIN CT
July 6, 2024 - 9:00am to July 19, 2024 - 3:00pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to SPRINGFIELD RD
July 6, 2024 - 9:00am to July 19, 2024 - 3:00pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to SPRINGFIELD RD
April 8, 2024 - 9:00am to July 5, 2024 - 3:00pm
No Disruption
SOUTH END OF ROAD to SPRINGFIELD RD
April 8, 2024 - 9:00am to July 5, 2024 - 3:00pm
Lane Drop - Multi Lane Road
BENVOULIN CT to BENVOULIN RD
April 8, 2024 - 9:00am to July 5, 2024 - 3:00pm
Lane Drop - Multi Lane Road
MAYER RD to SPRINGFIELD RD
April 8, 2024 - 9:00am to July 5, 2024 - 3:00pm
No Disruption
COOPER RD to BENVOULIN CT
April 8, 2024 - 9:00am to July 5, 2024 - 3:00pm
Lane Drop - Multi Lane Road
BENVOULIN CT to BENVOULIN RD
April 8, 2024 - 9:00am to July 5, 2024 - 3:00pm
No Disruption
Sutherland Ave ATC 1&2 - road and utilities construction. Removals, underground utilities, gravels, curb , sidewalk, electrical, landscaping. Please see attached RUP for extending our work on Sutherland. As noted, we will be complete from Ethel to Gordo
Permit number: RUP2024-0558
Project contact: Garrett Rutten
Phone: 250-859-1409
GORDON DR to CAPRI ST
June 24, 2024 (All day) to August 2, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Tilley Rd 232 - Sanitary Sewer Main and Services from intersection at Jim Bailey Rd to the East Property line of 232 tilly Rd
Permit number: RUP2024-0229
Project contact: Jim Tobin
Phone: 250-470-3561
JIM BAILEY RD to HALDANE RD
March 18, 2024 - 7:00am to June 30, 2024 - 6:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Tree Mtce _ Removal - Various City streets. No excavation.
Permit number: RUP2024-0007
Phone: 250-862-0734
EDGEWOOD DR to LEASIDE AVE
July 3, 2024 -
8:00am to 2:00pm
No Disruption
BERNARD AVE to LAWSON AVE
April 17, 2024 - 9:00am to December 17, 2024 - 2:00pm
Lane Drop - Multi Lane Road
SPRUCEGLEN DR to SPRUCEMONT CT
May 30, 2024 - 8:00am to December 31, 2024 - 3:30pm
Continually Moving Work
SPRUCEMONT CT to LIPSETT CT
May 30, 2024 - 8:00am to December 31, 2024 - 3:30pm
Continually Moving Work
Various City Streets 2024 - Window Cleaning Purposes
Permit number: RUP2024-0129
PANDOSY ST to MCKAY AVE
July 8, 2024 - 8:00am to July 10, 2024 - 5:00pm
No Disruption
Wardlaw Ave 602 - unloading and unloading materials. Intermittent Ongoing thru the end of the year to manage deliveries only
Permit number: RUP2024-0019
Project contact: Lance Beaudoin
PANDOSY ST to RICHTER ST
January 1, 2024 - 8:00am to October 31, 2024 - 6:00pm
Single Lane Alternating
Water St 1580 & 1570 - Demolish building and construct new building. Hoarding required on Lawrence, lane and Water St
Permit number: RUP2024-0068
Project contact: Slava Korshunov
LAWRENCE AVE to LANE
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Water St 1659 / Leon Ave - errect scafolding to close portion of walkway at the corner to work on building.
Permit number: RUP2024-0008
Project contact: Thomas Scheffer
Phone: 778-214-7214
WATER ST to PANDOSY ST
January 5, 2024 (All day) to October 23, 2024 (All day)
No Disruption
HARVEY AVE to LEON AVE
January 5, 2024 (All day) to October 23, 2024 (All day)
No Disruption
WATER ST to PANDOSY ST
January 5, 2024 (All day) to October 23, 2024 (All day)
HARVEY AVE to LEON AVE
January 5, 2024 (All day) to October 23, 2024 (All day)
Weddell/Richter Ethel Traffic Control Training - 2024
Permit number: RUP2023-0984
Project contact: Alex Johnson
CROWLEY AVE to ETHEL ST
July 14, 2024 -
8:00am to 4:00pm
Single Lane Alternating
WEDDELL PL to ETHEL ST
July 7, 2024 -
8:00am to 4:00pm
Single Lane Alternating
WEDDELL PL to ETHEL ST
July 14, 2024 -
8:00am to 4:00pm
Single Lane Alternating
ETHEL ST to GORDON DR
July 7, 2024 -
8:00am to 4:00pm
Single Lane Alternating
ETHEL ST to GORDON DR
July 14, 2024 -
8:00am to 4:00pm
Single Lane Alternating
CROWLEY AVE to ETHEL ST
July 7, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RICHTER ST to CROWLEY AVE
July 7, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RICHTER ST to CROWLEY AVE
July 14, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RECREATION AVE to WEDDELL PL
July 14, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RICHTER ST to ETHEL ST
July 7, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RICHTER ST to ETHEL ST
July 14, 2024 -
8:00am to 4:00pm
Single Lane Alternating
BAILLIE AVE to RECREATION AVE
July 7, 2024 -
8:00am to 4:00pm
Single Lane Alternating
BAILLIE AVE to RECREATION AVE
July 14, 2024 -
8:00am to 4:00pm
Single Lane Alternating
RECREATION AVE to WEDDELL PL
July 7, 2024 -
8:00am to 4:00pm
Single Lane Alternating
GASTON AVE to BAILLIE AVE
July 7, 2024 -
8:00am to 4:00pm
Single Lane Alternating
GASTON AVE to BAILLIE AVE
July 14, 2024 -
8:00am to 4:00pm
Single Lane Alternating
Window Cleaning 2024 - various City streets
Permit number: RUP2024-0420
Project contact: Alex Blais
RICHTER ST to ETHEL ST
July 2, 2024 - 7:00am to July 3, 2024 - 4:30pm
No Disruption
CORONATION AVE to CLEMENT AVE
July 2, 2024 - 7:00am to July 3, 2024 - 4:30pm
No Disruption