Permit number: RUP2025-0005
Project contact: Jeff Walowski
Phone: 204-777-1972
BENVOULIN CT to BENVOULIN RD
January 6, 2025 - 9:00am to January 8, 2025 - 3:00pm
Lane Drop - Multi Lane Road
Abbott St 3061 - shallow utility installation. Road will be closed 7am to 5pm Mon to Fri.
Permit number: RUP2024-0795
Project contact: Sheilan Laing
Phone: 604-845-6113
ABBOTT ST to PANDOSY ST
August 27, 2024 (All day) to February 28, 2025 (All day)
Full Road Closure, No Through Traffic, Detour
MEIKLE AVE to NEWSOM AVE
August 27, 2024 (All day) to February 28, 2025 (All day)
Full Road Closure, No Through Traffic, Detour
Ambrosi Rd 1946 - grout manhole
Permit number: RUP2025-0012
Project contact: Vicky Bachelder
Phone: 250-870-4549
SPRINGFIELD RD to AGASSIZ RD
January 6, 2025 - 7:00am to January 7, 2025 - 5:00pm
No Disruption
Asher Rd 500 - deliveries
Permit number: RUP2025-0025
Project contact: Mike Badau
Phone: 250-215-5667
PONTO RD to LEATHEAD RD
January 13, 2025 - 7:00am to January 17, 2025 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Benvoulin Rd/Mayer Rd & Byrns Rd - aerial placing, UG placing & UG splicing. No excavation required. No excavation. Everything will be completed using existing infrastructure of hydro poles and manholes to pull underground.
Permit number: RUP2024-1149
Project contact: Ryan Quellette
BEETLESTONE DR to BYRNS RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
BYRNS RD to COOPER RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to BENVOULIN RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
COOPER RD to MAYER RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
MAYER RD to SPRINGFIELD RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
BURTCH RD to BENVOULIN RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
Bertram Ave 1333 - garbage bin in 2 City parking stalls
Permit number: RUP2024-0944
Project contact: Levi Maximick
Phone: 236-597-7520
FULLER AVE to CAWSTON AVE
October 8, 2024 (All day) to January 31, 2025 (All day)
No Disruption
Bertram St 1333 - concrete pour
Permit number: RUP2025-0013
Project contact: Levi Maximick
FULLER AVE to CAWSTON AVE
January 9, 2025 -
7:00am to 3:00pm
Full Road Closure, No Through Traffic, Detour
Bertram St 1333 - install storm manhole & CB
Permit number: RUP2024-1141
Project contact: Randy Smith
Phone: 250-826-8876
FULLER AVE to CAWSTON AVE
January 6, 2025 - 7:00am to January 17, 2025 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
Bertram St 1333 - lay down area for construction material
Permit number: RUP2024-0432
Project contact: Levi Maximick
Phone: 778-760-5525
BERTRAM ST to LANE
May 27, 2024 (All day) to January 31, 2025 (All day)
Full Road Closure, No Through Traffic, Detour
Bonjou Crt 4553 - Rogers Cable - we will be digging beside PED located infront of 4575 Bonjjoyu Crt to repair the existing conduit. There is no sidewalk. We will not be placing any new conduit.
Permit number: RUP2025-0009
Project contact: Him Drew
Phone: 250-718-9434
BONJOU RD to NORTH END OF ROAD
January 14, 2025 - 9:00am to January 15, 2025 - 3:30pm
No Disruption
Boynton Pl 630 - BA 100m2 parks parking lot is currently prohibiting construction equipment access to the North side of our construction site. Construction access will be required for a number of months in order to accommodate the equipment needed to ins
Permit number: RUP2024-0828
Project contact: Tanner Brockman
Phone: 306-231-3771
HIGHPOINTE DR to CARAMILLO RD
September 1, 2024 (All day) to March 31, 2025 (All day)
No Disruption
Chandler St/Belaire Ave/Pridham - use of street and sidewalk for site office, garage disposal storage. C-can loading and unloading of trucks. Site is fully fenced.
Permit number: RUP2024-1148
Project contact: Mike Partington
Phone: 250-980-6800
DEVONSHIRE AVE to CHANDLER ST
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
DEVONSHIRE AVE to CHANDLER ST
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
PRIDHAM AVE to BELAIRE AVE
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
Clement Ave 647 - install Telus conduit. Removal and reinstall of sidewalk impacted back to site. Will need to cone off the bike lane during construction hours in order to accommodate excavator. No traffic interruptions.
Permit number: RUP2024-1099
Project contact: Jeff Simmons
ST PAUL ST to RICHTER ST
December 2, 2024 - 7:00am to January 10, 2025 - 7:00pm
No Disruption
Crowley Ave & Ethel St - no installation of works, opening up bellhole to check depth of existing main prior to works being installed in the spring/summer 2025
Permit number: RUP2024-1151
Project contact: Maddi Stevens
Phone: 250-663-9911
WEDDELL PL to CROWLEY AVE
January 6, 2025 - 8:00am to January 10, 2025 - 4:00pm
Lane Drop - Multi Lane Road
WEDDELL PL to ETHEL ST
January 6, 2025 - 8:00am to January 10, 2025 - 4:00pm
Lane Drop - Multi Lane Road
Ethel/Trench/Broadway - Royal View water main transmission design and implementation support. Hydrovacing.
Permit number: RUP2024-1137
Project contact: Kyle Jones
Phone: 778-878-2085
CAMBRIDGE AVE to WALROD ST
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
KNOX MOUNTAIN DR to KINGSWAY
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
CROWLEY AVE to ETHEL ST
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
ETHEL ST to GORDON DR
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
KINGSWAY to CAMBRIDGE AVE
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
CENTRAL AVE to CAMBRIDGE AVE
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
WALROD ST to JONES ST
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
BAY AVE to NORTH END OF ROAD
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
CAMBRIDGE AVE to BROADWAY AVE
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
CROWLEY AVE to BAY AVE
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
WEDDELL PL to CROWLEY AVE
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
CROWLEY AVE to GORDON DR
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
TRENCH CT to EAST END OF ROAD
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
JONES ST to TRENCH CT
December 16, 2024 - 7:00am to January 16, 2025 - 5:00pm
Single Lane Alternating
Fortis Mtce Annual Permit - non excavation all overhead on various city streets.
Permit number: RUP2025-0021
Project contact: Dustin Bates
Phone: 250-717-0828
MCCULLOCH RD to POOLEY RD
January 20, 2025 -
9:00am to 3:00pm
Single Lane Alternating
Frost Rd 1003-1111 - emergency Fortis duct repair in grass boulevard on the north east corner of Frost @ Gordon Dr
Permit number: RUP2024-1114
Project contact: Brad Hanks
GORDON DR to STEELE RD
December 5, 2024 - 7:00am to January 24, 2025 - 5:00pm
No Disruption
Frost Rd 1055 - the project involves constructing a secure pedestrian scaffold tunnel along the sidewalk at the frontage of road.
Permit number: RUP2024-1052
Project contact: Josh Arneson
GORDON DR to STEELE RD
December 2, 2024 - 7:00am to December 31, 2025 - 6:00pm
No Disruption
Gaggin Rd & Gertsmar Rd - pole access and manhole access for cable placing and splicing. No excavation for this work. working on existing infrastructure
Permit number: RUP2024-1154
Project contact: Todd Basso
GAGGIN RD to MORGAN RD
January 9, 2025 - 9:00am to January 10, 2025 - 3:30pm
Single Lane Alternating
TAYLOR RD to GERSTMAR RD
January 9, 2025 - 9:00am to January 10, 2025 - 3:30pm
Single Lane Alternating
Gallagher Crt 1945 - repair conduit near the PED across the street from customers home. The PED is locatewd infront of 1950 Gallagher Crt. This work will take approx 2 hours. There is no sidewalk
Permit number: RUP2024-1161
Project contact: Hailey Schmidt
WEST END OF ROAD to GALLAGHER RD
January 8, 2025 - 9:00am to January 9, 2025 - 3:30pm
No Disruption
Gallaghers Cir 3957 - Rogers Cable - digging beside PED bet 3953 and 3955 Gallaghers Circle to repair existing Rogwrs conduit. We will not be placing any new infrastructure. There is no sidewalk.
Permit number: RUP2025-0008
Project contact: Him Drew
Phone: 250-718-9434
GALLAGHERS CR to GALLAGHERS CR
January 14, 2025 - 9:00am to January 15, 2025 - 3:30pm
No Disruption
Higland Dr N 1515 - big steel box on City road shoulder for moving residential contents
Permit number: RUP2024-1110
Project contact: Alana White
BLONDEAUX CR to WILLOW CR
December 19, 2024 (All day) to January 18, 2025 (All day)
No Disruption
Hoarding - portion of road.
Permit number: RUP2024-1000
Project contact: Will Monforton
Phone: 250-258-9113
GORDON DR to ASPEN CT
November 1, 2024 - 7:00am to April 30, 2025 - 5:00pm
Single Lane Alternating
Holland Rd 3010 - excavating to install shallow utilities.
Permit number: RUP2024-1107
Project contact: Bree Macmullen
Phone: 250-300-3221
KLO RD to NORTH END OF ROAD
December 3, 2024 - 7:00am to January 17, 2025 - 5:00pm
Single Lane Alternating
KLO Bridge Upgrade, Re-locate 3PH Primary Overhead Primary Overhead Line - COK Project. Relocating the OH powerline to the south side of KLIO Rd to accommodate the new bridge construction. Will be installing 9 poles, 16 anchors and removing 6 poles and 5
Permit number: RUP2024-1077
Project contact: Jeff Avila
Phone: 250-212-0959
SPIERS RD to HALL RD
December 3, 2024 - 9:00am to February 3, 2025 - 3:00pm
Single Lane Alternating
LEADER RD to SPIERS RD
December 3, 2024 - 9:00am to February 3, 2025 - 3:00pm
Single Lane Alternating
Leon Ave 238 / Water St - Climbing crane down and loading out crane sections at the Water St by the Park Project.
Permit number: RUP2024-1144
Project contact: Chris Morneau
Phone: 250-258-5433
LEON AVE to LAWRENCE AVE
January 6, 2025 (All day) to January 12, 2025 (All day)
HARVEY AVE to LEON AVE
January 6, 2025 (All day) to January 12, 2025 (All day)
ABBOTT ST to WATER ST
January 6, 2025 - 7:00am to January 12, 2025 - 5:00pm
Lane Drop - Multi Lane Road
BOYCE CR to HARVEY AVE
January 6, 2025 - 7:00am to January 12, 2025 - 5:00pm
Lane Drop - Multi Lane Road
Leon Ave 278 non excavation work only. Deliveries and entering or exiting site.
Permit number: RUP2025-0022
Project contact: Stephanie Mattson
ABBOTT ST to WATER ST
January 1, 2025 - 7:00am to December 31, 2025 - 5:00pm
Lane Drop - Multi Lane Road
Mallach Rd 335 - digging trench for install of Fortis electrical line which will be installed by Fortis themselves.
Permit number: RUP2024-1152
Project contact: Jordan Salahur
Phone: 250-718-9871
HOLBROOK RD E to MILTON RD
January 6, 2025 - 7:00am to January 7, 2025 - 3:30pm
No Disruption
Parks Mtce Duties - non excavation. Tree trimming, irrigation etc.
Permit number: RUP2025-0020
Project contact: Suart McKay
Phone: 250-868-6600
DENALI DR to CHILCOTIN CR
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
SUMMIT DR to DENALI CT
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
CROWLEY AVE to ETHEL ST
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
ETHEL ST to GORDON DR
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
VALLEY RD to DENALI DR
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
CLIFTON RD to SPALL RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
MCKENZIE RD to TREETOP RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
DOYLE AVE to SMITH AVE
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
BELGO RD to GARNER RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
BEGBIE RD to JOHN HINDLE DR
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
JOHN HINDLE DR to MCKINLEY RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
GLENMORE RD N to ACADEMY WAY
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to GARNER RD
January 6, 2025 - 9:00am to January 10, 2025 - 3:30pm
Lane Drop - Multi Lane Road
CARSHYL CT to BARON RD
January 7, 2025 - 9:00am to January 10, 2025 - 2:00pm
Single Lane Alternating
Pridham Ave & Chandler St - Telus Utility work - pole and service vault access for cable placing and splicing. No excavation for this work - working on existing infrastructure.
Permit number: RUP2024-1155
Project contact: Marley Futerko
Phone: Ext 337
DEVONSHIRE AVE to CHANDLER ST
January 14, 2025 - 9:00am to January 17, 2025 - 3:30pm
Single Lane Alternating
PRIDHAM AVE to BELAIRE AVE
January 14, 2025 - 9:00am to January 17, 2025 - 3:30pm
Single Lane Alternating
Raymer Ave 750 - excavate for Fortis service install (Lane)
Permit number: RUP2025-0023
Project contact: Alex Richardson
Phone: 250-808-5809
RICHTER ST to CURTS ST
December 30, 2024 (All day) to January 15, 2025 (All day)
Rodondo Pl 1296 -Rogers Cabe - we will need to dig beside PED infront of 1290 Rodondo Pl and repair existing conduit. We will not be placing any new conduit.
Permit number: RUP2025-0007
Project contact: Him Drew
Phone: 250-718-9434
RIALTO DR to EAST END OF ROAD
January 14, 2025 - 9:00am to January 15, 2025 - 3:30pm
No Disruption
Seasonal Permit - all non excavation work on various City streets for 2024.
Permit number: RUP2023-0980
Project contact: Darren Langford
Phone: 250-859-0349
COOPER RD to BENVOULIN CT
January 6, 2025 - 9:00am to January 17, 2025 - 3:00pm
Lane Drop - Multi Lane Road
BENVOULIN CT to BENVOULIN RD
January 6, 2025 - 9:00am to January 17, 2025 - 3:00pm
Lane Drop - Multi Lane Road
Springfield Rd @ Benvoulin Crt - Replace power pole for Allteck. Waiting for sidewalk repair to be done.
Permit number: RUP2024-1162
Project contact: Reid Bicknell
COOPER RD to BENVOULIN CT
December 20, 2024 - 9:00am to January 25, 2025 - 5:00pm
Lane Drop - Multi Lane Road
BENVOULIN CT to BENVOULIN RD
December 20, 2024 - 9:00am to January 25, 2025 - 5:00pm
Lane Drop - Multi Lane Road
St Paul St @ Doyle Ave 550 - pouring and pumping concrete
Permit number: RUP2024-1156
Project contact: Scott Spiers
DOYLE AVE to CAWSTON AVE
January 8, 2025 -
6:30am to 4:30pm
Full Road Closure, No Through Traffic, Detour
Stockwell Ave 954 - excavate for Fortis service install on property and pole replacement on edge of alley.
Permit number: RUP2025-0024
Project contact: Alex Richardson
Phone: 250-808-5809
ETHEL ST to GRAHAM ST
January 13, 2025 - 8:00am to January 17, 2025 - 4:00pm
Full Road Closure, Local Traffic Only, No Through Traffic
Sunset Dr 1181 - crane will be hoisting scaffolding materials onto building
Permit number: RUP2024-1139
Project contact: Glen Green
Phone: 250-869-5411
WATER ST to GUY ST
January 8, 2025 -
8:00am to 4:00pm
Single Lane Alternating
Sutherland Ave 534 (back Lan e) - replacing vault in alleyway behind 534 Sutherland Ave. TMP attached. This was a City request. The current vault has eroded and makes noise when driven over as it is uneven. 3 to 4 hours approx.
Permit number: RUP2025-0010
Project contact: Him Drew
Phone: 250-718-9434
DEAD END to ROWCLIFFE AVE
January 21, 2025 - 9:00am to January 22, 2025 - 4:30pm
Local Traffic Only, No Through Traffic, Detour
Terrace Hill Crt 158 - Telus Purefibre - We need to dig in the City Utlity right of way to uncover a buried vault infront of 159 Terrace Hill Crt. Which is across the street from the customer's home. There is no sidewalk on either side of the road. TMP
Permit number: RUP2025-0006
Project contact: Him Drew
Phone: 250-718-9434
TERRACE HILL PL to NORTH END OF ROAD
January 7, 2025 - 9:00am to January 8, 2025 - 3:30pm
No Disruption
Underhill St & Baron Rd - closure of the sidewalk and bike lane on Baron Rd to accommodate construction. cyclists and peds will have signed detour route. Crosswalk to be setup on Underhill.
Permit number: RUP2024-1159
Project contact: Esther Elechi
DILWORTH DR to UNDERHILL ST
January 20, 2025 (All day) to December 31, 2025 (All day)
No Disruption
HAYNES RD to BARON RD
January 20, 2025 (All day) to December 31, 2025 (All day)
No Disruption
Water Service Repairs - Annual Permit various City streets
Permit number: RUP2025-0016
Project contact: Jens Petersen
Phone: 250-469-8424
WATT RD to MEIKLE AVE
January 6, 2025 - 7:30am to January 7, 2025 - 3:00pm
Single Lane Alternating
WEST END OF ROAD to LAKESHORE RD
January 6, 2025 - 7:30am to January 7, 2025 - 3:00pm
No Disruption
Water St 1580 & 1570 - Demolish building and construct new building. Hoarding required on Lawrence, lane and Water St
Permit number: RUP2024-0068
Project contact: Slava Korshunov
LAWRENCE AVE to LANE
January 1, 2024 (All day) to February 28, 2025 (All day)
Lane Drop - Multi Lane Road
ABBOTT ST to WATER ST
January 1, 2024 (All day) to February 28, 2025 (All day)
Lane Drop - Multi Lane Road
Water St @ 238 Leon Ave - road closure on Water St (Harvey to Laneway bet Lawrence & Leon Ave) for crane activity. Removing tower crane
Permit number: RUP2024-1145
Project contact: Chris Morneau
Phone: 250-258-5433
LEON AVE to LAWRENCE AVE
January 11, 2025 - 7:00am to January 12, 2025 - 5:00pm
Full Road Closure, No Through Traffic, Detour
HARVEY AVE to LEON AVE
January 11, 2025 - 7:00am to January 12, 2025 - 5:00pm
Full Road Closure, No Through Traffic, Detour