Road report
Road information is based on issued road usage permits. All public and private contractors are required to obtain a road usage permit for work affecting traffic flow. Click on a coloured line on the map for details about traffic impacts.
2024 Seasonal Permit - concrete pour. Pump truck will block road access on Dougal Rd on selected days only. Road will be unobstructed on majority of days otherwise. Set up time 6 am but will not start pouring till 7 am
Permit number: RUP2024-0227
SHEPHERD RD to MCINTOSH RD
January 1, 1900 (All day) to December 31, 2024 (All day)
760 Cantina Court - Building a Dry-stack engineered Rock Retaining Wall in the backyard. Needing use of cul-de-sac for delivery of rock product. We will have the cones set up and wearing vizi vests while moving rock to backyard. We will also make sure to
Permit number: RUP2024-1043
SOUTH RIDGE DR to EAST END OF ROAD
November 7, 2024 - 8:00am to December 7, 2024 - 4:00pm
No Disruption
Abbott St 3061 - install storm main
Permit number: RUP2024-0795
ABBOTT ST to PANDOSY ST
August 27, 2024 - 7:00am to December 30, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
MEIKLE AVE to NEWSOM AVE
August 27, 2024 - 7:00am to December 30, 2024 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Appaloosa Rd 3256 - Utility trailer partially on City road shoulder. No traffic interruptions.
Permit number: RUP2024-0237
Project contact: Liam Gibson
Email: lgibson@orionconstruction.ca
ACADEMY WAY to PINTO RD
March 22, 2024 (All day) to December 31, 2024 (All day)
No Disruption
ACADEMY WAY to PINTO RD
March 22, 2024 (All day) to December 31, 2024 (All day)
Asher Rd 500 - wood prefabricated Wall Deliveries
Permit number: RUP2024-1104
Project contact: Lisa Lapointe
PONTO RD to LEATHEAD RD
December 5, 2024 - 7:00am to December 6, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Belaire 1365 / Chandler St 1840 & 1850 - continue use of frontage including sidewalk for site office, garage disposal C-can, loading and unloading of trucks. Site is fully fenced.
Permit number: RUP2024-0831
DEVONSHIRE AVE to CHANDLER ST
September 1, 2024 - 7:00am to December 31, 2024 - 7:00pm
No Disruption
Bertram Ave 1333 - garbage bin in 2 City parking stalls
Permit number: RUP2024-0944
FULLER AVE to CAWSTON AVE
October 8, 2024 (All day) to December 31, 2024 (All day)
Bertram St (Leon to Harvey Ave ) NB & SB - construction of the north ramp overpass. Works include asphalt, landscaping, concrete removal, deep and shallow foundation work, construction of an ongrade and suspended concrete ramp structure.
Permit number: RUP2024-0141
LEON AVE to BERTRAM ST
March 4, 2024 (All day) to December 31, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Bertram St 1333 - install new hydrant and do water tie-in.
Work done in the gravel boulevard. Traffic will be shifted slightly to the west but 2 way traffic will be maintained.
Permit number: RUP2024-1078
FULLER AVE to CAWSTON AVE
November 25, 2024 - 7:00am to December 10, 2024 - 3:00pm
Lane Drop - Multi Lane Road
Bertram St 1333 - Breezeway install along sidewalk infront of address. Will allow edestrians to use the sidewalk without construction impedance. Office on top of breezeway.
Permit number: RUP2024-0575
FULLER AVE to CAWSTON AVE
August 1, 2024 (All day) to December 31, 2024 (All day)
FULLER AVE to CAWSTON AVE
August 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Bertram St 1333 - concrete pump set up outside of 1333 Bertram for a concrete pour
Permit number: RUP2024-1067
FULLER AVE to CAWSTON AVE
December 10, 2024 -
7:00am to 1:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
FULLER AVE to CAWSTON AVE
December 5, 2024 (All day)
Bertram St 1333 - lay down area for construction material
Permit number: RUP2024-0432
BERTRAM ST to LANE
May 27, 2024 (All day) to December 31, 2024 (All day)
No Disruption
FULLER AVE to CAWSTON AVE
May 27, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Boynton Pl 630 - parking space and sidewalk use for construction in area.
Permit number: RUP2024-0023
HIGHPOINTE DR to CARAMILLO RD
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Clement Ave 647 - install Telus conduit. Removal and reinstall of sidewalk impacted back to site. Will need to cone off the bike lane during construction hours in order to accommodate excavator. No traffic interruptions.
Permit number: RUP2024-1099
Project contact: Jeff Simmons
Email: jeff@dirt-pro.ca
ST PAUL ST to RICHTER ST
December 2, 2024 - 7:00am to December 13, 2024 - 7:00pm
Lane Drop - Multi Lane Road
Comment:Abbott St 3061/Cedar Ave - extend construction fencing to the edge of the roadway to allow for a safer work area for site personnel as well as the general public. Ongoing construction of an 87 unit wood frame, 7 story building.
Permit number: RUP2023-0972
MEIKLE AVE to NEWSOM AVE
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
ABBOTT ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:00pm
No Disruption
Comment:Benvoulin Rd @ 2241 Springfield Rd - trucks hauling on and off site with earth materials. Few intermittent interruptions. No real traffic interruptions. Will follow rules of the road.
Permit number: RUP2024-0006
MAYER RD to SPRINGFIELD RD
December 1, 2024 - 9:00am to December 13, 2024 - 3:00pm
Lane Drop - Multi Lane Road
Connect Frost Rd from Treadgold to Chute Lake Rd and add round-a-bout at the intersection of Chute Lake Rd, Frost Rd & Chute Lake Cres
Permit number: RUP2024-1103
TREADGOLD CT to KILLDEER RD
November 29, 2024 - 7:00am to December 20, 2024 - 9:00am
Single Lane Alternating
Coronation Ave 1036 - upgrade watermain, storm upgrades. Only closing half the road as per TMP
Permit number: RUP2024-0910
GRAHAM ST to GORDON DR
November 15, 2024 - 7:00am to December 6, 2024 - 7:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Dehart Rd 659 - Excavation on Dehart Rd to facilitate utility upgrades and service connections to Dehart Community Park Construction. Regarding and asphalt surface upgrades to Dehart Rd for new boulevard, sidewalk and multi-use pathway, landscaping and l
Permit number: RUP2024-0484
SARSONS RD to GORDON DR
June 15, 2024 - 9:00am to December 6, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Devonshire 1274 - deliveries and any traffic interruptions
Permit number: RUP2024-0855
PRIDHAM AVE to BELAIRE AVE
September 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
PRIDHAM AVE to BELAIRE AVE
September 1, 2024 (All day) to December 31, 2024 (All day)
Dougal Rd N 540 (Lane) - loading and off loading materials in back lane. Brief 15 minute closure while load and unloading.
Permit number: RUP2024-0852
Project contact: Hans Gerritsen 403-850-1542
Email: karbabifard@wcpg.ca
MCINTOSH RD to LEATHEAD RD
September 9, 2024 - 6:00am to December 31, 2024 - 6:00pm
Lane Drop - Multi Lane Road
Dougal Rd S 165 - sidewalk closure for building construction purposes. Sidewalk closure signs posted and pedestrians detoured to sidewalk on other side of the street. 60 meters used. TMP attached
Permit number: RUP2024-1014
GRAY RD to VALLEYVIEW RD
October 31, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Doyle Ave 550 / St Paul St- Jersey barrier set up along alley, Doyle Ave and St Paul for public safety from construction traffic and future excavation
Permit number: RUP2023-0973
Project contact: Lauren Cooper
Email: lauren.cooper@ledcor.com
ST PAUL ST to BERTRAM ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Fortis Seasonal Permit - all overhead works. No excavation work only. Various City Streets
Permit number: RUP2024-0005
CAPRI ST to PACIFIC CT
December 3, 2024 - 9:00am to December 4, 2024 - 3:00pm
Lane Drop - Multi Lane Road
Fortis Weekly Service Installs - various City streets
Permit number: RUP2024-1109
NOBLE CT to BURTCH RD
December 2, 2024 - 7:00am to December 6, 2024 - 5:00pm
Lane Drop - Multi Lane Road
QUARTZ CR to NORTH END OF ROAD
December 2, 2024 - 7:00am to December 6, 2024 - 5:00pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to DRY VALLEY RD
December 2, 2024 - 7:00am to December 6, 2024 - 5:00pm
Lane Drop - Multi Lane Road
LOCHNESS ST to NAIRN AVE
December 2, 2024 - 7:00am to December 6, 2024 - 5:00pm
Lane Drop - Multi Lane Road
KESTREL LANE to TRUMPETER RD
December 2, 2024 - 7:00am to December 6, 2024 - 5:00pm
Lane Drop - Multi Lane Road
AEROSPACE DR to LAPOINTE DR
December 2, 2024 - 7:00am to December 6, 2024 - 5:00pm
Lane Drop - Multi Lane Road
GORDON DR to STEELE RD
December 2, 2024 - 7:00am to December 6, 2024 - 5:00pm
Lane Drop - Multi Lane Road
CARNOUSTIE DR to ROYAL TROON LANE
December 2, 2024 - 7:00am to December 6, 2024 - 5:00pm
Lane Drop - Multi Lane Road
KINGSWOOD TERR to KINGSWOOD TERR
December 2, 2024 - 7:00am to December 6, 2024 - 5:00pm
Lane Drop - Multi Lane Road
LAVETTA DR to YOCHIM AVE
December 2, 2024 - 7:00am to December 6, 2024 - 5:00pm
Lane Drop - Multi Lane Road
Frost Rd 1055 - the project involves constructing a secure pedestrian scaffold tunnel along the sidewalk at the frontage of road.
Permit number: RUP2024-1052
Project contact: Josh Arneson
Email: jarneson@gohighstreet.ca
GORDON DR to STEELE RD
December 2, 2024 - 6:00am to December 31, 2024 - 6:00pm
No Disruption
Graham Rd 875/Matt Rd - install new water, sanitary, storm for new development including sidewalks, curbs and asphalt.
Permit number: RUP2024-0954
Project contact: Ricky Sekhon
Email: ricky.s@bostonearthworks.com
BRIAN RD to GRAHAM RD
October 15, 2024 (All day) to December 20, 2024 (All day)
BRIAN RD to GRAHAM RD
October 15, 2024 - 7:00am to December 20, 2024 - 5:00pm
Single Lane Alternating
BRIAN RD to GRAHAM RD
October 15, 2024 (All day) to December 20, 2024 (All day)
RUSTON RD to MATT RD
October 15, 2024 (All day) to December 20, 2024 (All day)
RUSTON RD to MATT RD
October 15, 2024 - 7:00am to December 20, 2024 - 5:00pm
Single Lane Alternating
RUSTON RD to MATT RD
October 15, 2024 (All day) to December 20, 2024 (All day)
MATT RD to STIRLING RD
October 15, 2024 - 7:00am to December 20, 2024 - 5:00pm
Single Lane Alternating
MATT RD to STIRLING RD
October 15, 2024 (All day) to December 20, 2024 (All day)
MATT RD to STIRLING RD
October 15, 2024 (All day) to December 20, 2024 (All day)
Hilltown Dr 3271 - closing parking lane to create a loading/unloading zone for duration of construction.
NO STORAGE OF MATERIAL OR EQUIPMENT IS PERMITED UNDER A TRAFFIC IMPEDANCE PERMIT. IF THIS IS REQUIRED A HOARDING PERMIT WILL BE NEEDED.
Permit number: RUP2024-1105
BLUE BUNCH CT to NORTHERN FLICKER CT
December 2, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Hoarding - portion of road.
Permit number: RUP2024-1000
GORDON DR to ASPEN CT
November 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Single Lane Alternating
Holland Rd 3010 - excavating to install shallow utilities.
Permit number: RUP2024-1107
KLO RD to NORTH END OF ROAD
December 3, 2024 - 7:00am to December 10, 2024 - 5:00pm
Single Lane Alternating
June Springs Rd & Miller Rd - replacing power poles some in old holes and some digging new holes beside the old ones and changing out the power line.
Permit number: RUP2024-1076
Project contact: Darren Belanger
Email: dbelanger@allteck.com
LEMKY RD to SPIERS RD
November 25, 2024 - 8:30am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
TATLOW RD to LEMKY RD
November 25, 2024 - 8:30am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
JUNE SPRINGS RD to EAST END OF ROAD
November 25, 2024 - 8:30am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
MCCLAIN RD to TATLOW RD
November 25, 2024 - 8:30am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
MILLER RD to MCCLAIN RD
November 25, 2024 - 8:30am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
Jupiter Crt 115 @ Rutland Rd S - complete last section for drilling to complete permitting civil extents. Traffic not interrupted.
Permit number: RUP2024-1102
Project contact: Barry Owen
Email: barry@cleartechnologies.ca
RUTLAND RD S to PRINCESS RD
December 3, 2024 - 7:00am to December 6, 2024 - 5:00pm
No Disruption
KLO Bridge Upgrade, Re-locate 3PH Primary Overhead Primary Overhead Line - COK Project. Relocating the OH powerline to the south side of KLIO Rd to accommodate the new bridge construction. Will be installing 9 poles, 16 anchors and removing 6 poles and 5
Permit number: RUP2024-1077
LEADER RD to SPIERS RD
December 3, 2024 - 9:00am to December 31, 2024 - 3:00pm
Single Lane Alternating
SPIERS RD to HALL RD
December 3, 2024 - 9:00am to December 31, 2024 - 3:00pm
Single Lane Alternating
KLO Rd 1760 - Fortis conduit installation. Excavation is sidewalk concrete leading adjacent power pole. Sidewalk and bike closure required. Lane push to maintain two-lanes of traffic and allow for pedestrian and bike access.
Permit number: RUP2024-1089
BURTCH RD to BENVOULIN RD
December 9, 2024 - 9:00am to December 13, 2024 - 3:30pm
Lane Drop - Multi Lane Road
Lakeshore Rd (Dehart Rd to Lexington & Bluebird - system improvement gas main install. SLAT my only occur 9am to 3:30pm Monday to Friday.
Permit number: RUP2024-0988
CORYELL RD to SIMEON CT
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
HOBSON RD to OLD MEADOWS RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
OLD MEADOWS RD to ARMOUR CR
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
ARMOUR CR to LEQUIME RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
KENSINGTON DR to CORYELL RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
WILLMS RD to KENSINGTON DR
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
SIMEON CT to HOBSON RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
GREENE RD to WILLMS RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
DEHART RD to GREENE RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
LEQUIME RD to BLUEBIRD RD
October 28, 2024 - 9:00am to December 20, 2024 - 3:30pm
Single Lane Alternating
Lawrence Ave 1131 (Formerly 1605 Gordon Dr) - build 6 story building. Facilitate material drop off without distrubance to traffic on Gordon Dr, the contractor wishes to use the lane currently used for a bus stop and public parking. They will separate th
Permit number: RUP2023-0971
GORDON DR to CENTENNIAL CR
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
GORDON DR to CENTENNIAL CR
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Leckie ATC / Dilworth Dr - extension from Okanagan Rail Trail to the Mission Park Greenway along the north side of Leckie Rd. See attached maps.
Permit number: RUP2024-0321
ENTERPRISE WAY to HWY 97 N
November 1, 2024 - 7:00am to December 5, 2024 - 5:30pm
Single Lane Alternating
DILWORTH DR to HUNTER RD
November 1, 2024 - 7:00am to December 5, 2024 - 5:30pm
Single Lane Alternating
ENTERPRISE WAY to LECKIE PL
November 1, 2024 - 7:00am to December 5, 2024 - 5:30pm
Single Lane Alternating
HUNTER RD to ENTERPRISE WAY
November 1, 2024 - 7:00am to December 5, 2024 - 5:30pm
Single Lane Alternating
Leon Ave 278 - off loading and pumping concrete. Deliveries to site. Personnel entering or exiting site. Intermittent.
Permit number: RUP2023-0969
Project contact: Stephanie Mattson
Email: stephanie@amegagroup.ca
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Leon Ave 278 - usage of partial lane and sidewalk on the north side of Leon Ave bet Abbott & Water St for the construction of the Water Str by the Park Project. Also, used for deliveries and laydown for general construction activities.
Permit number: RUP2024-0548
Project contact: Stephanie Mattson
Email: stephanie@amegagroup.ca
LEON AVE to LAWRENCE AVE
June 1, 2024 (All day) to December 31, 2024 (All day)
Single Lane Alternating
Leon Ave 278 Hoarding Permit Issued - to show permit in place.
Permit number: RUP2023-0970
Project contact: Stephanie Mattson
Email: stephanie@amegagroup.ca
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Longhill Rd @ Rojem Rd - overhead arrial work only.
Permit number: RUP2024-1106
Project contact: Shea Nicholson
CROSS RD to ROJEM RD
December 5, 2024 - 7:00am to December 6, 2024 - 4:00pm
No Disruption
ROJEM RD to MAIL RD
December 5, 2024 - 7:00am to December 6, 2024 - 4:00pm
No Disruption
Manhattan Dr 955 - periodic deliveries. Temporary interruptions
Permit number: RUP2024-0895
Project contact: Olaf Nieczyporowicz
Email: olaf.niec@tkiconstruction.ca
MANHATTAN DR to GUY ST
October 8, 2024 - 10:00am to December 31, 2024 - 4:00pm
Local Traffic Only, No Through Traffic, Detour
McClure Rd 549-599- storm drain and sidewalk upgrades
Permit number: RUP2024-0961
POPLAR RD to DOEKSEN RD
October 16, 2024 - 7:00am to December 13, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
DOEKSEN RD to BONJOU RD
October 16, 2024 - 7:00am to December 13, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
KEITH RD to POPLAR RD
October 16, 2024 - 7:00am to December 13, 2024 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Noble Crt 1550 - construction trailer on City road shoulder and block sidewalk along west side of Noble Crt. (two way traffic to be maintained) Pedestrians can cross Noble Crt on Bernard Ave and use sidewalk on the East side of Noble Crt
Permit number: RUP2024-0695
Project contact: Joe Reynolds
Email: joe@westpointprojects.com
SOUTH END OF ROAD to BERNARD AVE
July 25, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Raymer Rd 709 - install new sterm/manholes, water, sewer to site including curb, gutter, sidewalk
Permit number: RUP2024-0948
Project contact: Darren Ryan
Email: darren@radcontracting.ca
HORAK RD to GORDON DR
October 16, 2024 - 7:00am to December 6, 2024 - 5:00pm
Local Traffic Only, No Through Traffic, Detour
Richter St 2609 - site hoarding area for storage of materials (Bike lane not affected. Total area is 55 m2 in area.
Permit number: RUP2024-0065
KINNEAR AVE to WARDLAW AVE
January 15, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Royal Ave & Long St - laydown and trailer site/seacan placement.
Permit number: RUP2023-0990
Project contact: Brady Allen
Email: brady.allen@bird.ca
LONG ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Lane Drop - Multi Lane Road
LONG ST to PANDOSY ST
January 1, 2024 - 7:00am to December 31, 2024 - 5:30pm
Lane Drop - Multi Lane Road
Rutland Rd N 169 - one lane and sidewalk closure for material laydown and deliveries/hoisting. A pedestrian provision has been accounted for. Total of 165 sqm of workk zone.
Permit number: RUP2024-0180
Phone: 403-367-1330
HWY 33 W to SHEPHERD RD
May 1, 2024 (All day) to December 31, 2024 (All day)
Lane Drop - Multi Lane Road
Rutland Sewer North East Phase 1 - Prior Rd S (starting on this road), Robson Rd E, Dillman Rd, Holbrook Rd E, Spartan Rd, Mallach
Rd, Jade Rd and Scaraboro Rd
Install sanitary sewer
Permit number: RUP2024-0347
MILTON RD to HWY 33 E
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
RUTLAND RD S to SCARBORO RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
MALLACH RD to MOLNAR RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
HUSCH RD to HOLBROOK RD E
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
SCARBORO RD to MALLACH RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
HOLBROOK RD E to MILTON RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
HUSCH RD to BELL RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
BELL RD to MOLNAR RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
BELL RD to MOLNAR RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
HUSCH RD to BELL RD
August 26, 2024 - 7:00am to December 13, 2024 - 5:30pm
Local Traffic Only, No Through Traffic, Detour
Saucier Ave 812 - closure of sidewalk, shoulder and single westbound lane of Saucier Ave. Site hoarding will be for approx 2 years.
Permit number: RUP2023-0987
Project contact: Brodie Scott
Email: brodie@westrichpacific.com
RICHTER ST to ETHEL ST
January 1, 2024 - 7:00am to December 31, 2024 - 7:00pm
Single Lane Alternating
Seasonal Permit - all non excavation work on various City streets for 2024.
Permit number: RUP2023-0980
SOUTH RIDGE DR to GORDON DR
December 4, 2024 - 9:00am to December 6, 2024 - 2:00pm
Single Lane Alternating
SOUTH END OF ROAD to SPRINGFIELD RD
December 4, 2024 - 9:00am to December 13, 2024 - 2:00pm
Lane Drop - Multi Lane Road
COOPER RD to BENVOULIN CT
November 25, 2024 - 9:00am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
SOUTH END OF ROAD to SPRINGFIELD RD
November 25, 2024 - 9:00am to December 6, 2024 - 2:00pm
Lane Drop - Multi Lane Road
St Paul St @ 550 Doyle Ave - Install first section of tower crane (base) - mobile crane from St Paul into excavation
Permit number: RUP2024-1097
DOYLE AVE to CAWSTON AVE
December 4, 2024 -
7:00am to 4:00pm
Full Road Closure, No Through Traffic, Detour
Sutherland Ave 1247 - install Fortis conduit.
We were recently notified that Fortis wants to complete a utility tie-in event at this location.
This will affect sidewalk traffic for approximately 1 week until the sidewalk can be fully restored and usa
Permit number: RUP2024-1101
CAPRI ST to PACIFIC CT
December 2, 2024 - 7:00am to December 10, 2024 - 4:00pm
No Disruption
Sutherland Ave 1280/Pridham Ave - Sidewalk closure only. Traffic will not be affected at all for the duratiion of this permit. Install of shallow utilities and tie-in off site utilities to complete on Sutherland and Pridham Ave.
Permit number: RUP2024-0681
Phone: 250-300-5093
Email: mkotter@millennialdev.ca
PRIDHAM AVE to BELAIRE AVE
July 13, 2024 (All day) to December 31, 2024 (All day)
No Disruption
WEST END OF ROAD to DEVONSHIRE AVE
July 13, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Sutherland Ave 1325 - all works at 1799 Gordon Dr (A&W) have been completed. Bike lane, sidewalk, shoulder and parking closures to complete additional works for the Sutherland ATC Project. Remaining works are on Sutherland Ave from Ethel to Burtch and
Permit number: RUP2024-1074
DEAD END to SUTHERLAND AVE
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
LEQUIME ST to GORDON DR
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
PACIFIC AVE to SUTHERLAND AVE
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
SUTHERLAND AVE to BORDEN AVE
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
CAPRI ST to PACIFIC CT
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
PACIFIC CT to LINDAHL ST
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
LINDAHL ST to CHANDLER ST
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
CHANDLER ST to BURTCH RD
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
GORDON DR to CAPRI ST
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
CARRUTHERS ST to BOWES ST
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
ETHEL ST to CARRUTHERS ST
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
BOWES ST to LEQUIME ST
November 28, 2024 - 9:00am to December 4, 2024 - 3:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
Tree Mtce _ Removal - Various City streets. No excavation.
Permit number: RUP2024-0007
Phone: 250-862-0734
Email: info@kelokatrafficcontrol.ca
BERNARD AVE to LAWSON AVE
April 17, 2024 - 9:00am to December 17, 2024 - 2:00pm
Lane Drop - Multi Lane Road
SPRUCEGLEN DR to SPRUCEMONT CT
May 30, 2024 - 8:00am to December 31, 2024 - 3:30pm
Continually Moving Work
SPRUCEMONT CT to LIPSETT CT
May 30, 2024 - 8:00am to December 31, 2024 - 3:30pm
Continually Moving Work
Trestle Ridge Dr 450 & 470 - new water, sanitary and storm service installation. road closure will be bet 470-458 Trestle Ridge Dr. Refer to attached maps/plan for excavation area, road closure points and detour route.
Permit number: RUP2024-0969
TRESTLE RIDGE CT to UPPER MISSION DR
October 17, 2024 (All day) to December 11, 2024 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Twinflower Cres 4989 - Big steel container on City road shoulder.
Permit number: RUP2024-1081
Email: morgan.marrs@sd23.bc.ca
BUCKHAVEN CT to BERGAMOT AVE
November 29, 2024 - 9:00am to December 5, 2024 - 4:00pm
No Disruption
Union Rd (bet Upper Canyon Dr & Begbie Rd) - upgrading of existing storm main for future developments. Extend sanitary, water and shallow utilities into future developments. Widen out road for new turning movements, and muiti-use path. Concrete flatwor
Permit number: RUP2024-0824
BEGBIE RD to UPPER CANYON DR N
September 3, 2024 - 7:00am to December 15, 2024 - 5:00pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Water Main Repairs 2024 - Various City Streets
Permit number: RUP2024-0050
GOODISON RD to JUNE SPRINGS RD
November 25, 2024 - 11:00am to December 26, 2024 - 3:00pm
Single Lane Alternating
SPALL RD to BREDIN RD
December 4, 2024 - 9:00am to December 6, 2024 - 3:00pm
Lane Drop - Multi Lane Road
Water St 1570 & 1580/Lawrence - Intermittent deliveries of sand and crush to site. Decommission, removal and clean up of site. Self erect crane etc.
Permit number: RUP2024-1100
LAWRENCE AVE to BERNARD AVE
November 29, 2024 - 7:00am to December 6, 2024 - 5:30pm
Lane Drop - Multi Lane Road
LAWRENCE AVE to BERNARD AVE
November 29, 2024 (All day) to December 6, 2024 (All day)
ABBOTT ST to WATER ST
November 29, 2024 (All day) to December 6, 2024 (All day)
ABBOTT ST to WATER ST
November 29, 2024 - 7:00am to December 6, 2024 - 5:30pm
Lane Drop - Multi Lane Road
Water St 1580 & 1570 - Demolish building and construct new building. Hoarding required on Lawrence, lane and Water St
Permit number: RUP2024-0068
Project contact: Slava Korshunov
Email: skorshunov@vinesrebar.com
ABBOTT ST to WATER ST
January 1, 2024 - 8:00am to December 31, 2024 - 4:00pm
Lane Drop - Multi Lane Road
LAWRENCE AVE to LANE
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
ABBOTT ST to WATER ST
January 1, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Water St 1659 / Leon Ave - errect scafolding to close portion of walkway at the corner to work on building.
Permit number: RUP2024-0008
WATER ST to PANDOSY ST
January 5, 2024 (All day) to December 31, 2024 (All day)
No Disruption
HARVEY AVE to LEON AVE
January 5, 2024 (All day) to December 31, 2024 (All day)
No Disruption
Ziprick Rd 540 & Simpson Ave 1635 - install Fortis pole, pipe & conduit
Permit number: RUP2024-1093
Project contact: Randy Frasch
Email: rfraschent@shaw.ca
WENRIC CR to ZIPRICK RD
December 2, 2024 - 7:00am to December 11, 2024 - 3:30pm
Lane Drop - Multi Lane Road
SIMPSON AVE to CORNWALL RD
December 2, 2024 - 7:00am to December 11, 2024 - 3:30pm
Lane Drop - Multi Lane Road
WENRIC CR to WENRIC CR
December 2, 2024 - 7:00am to December 11, 2024 - 3:30pm
Lane Drop - Multi Lane Road