Road report
Road information is based on issued road usage permits. All public and private contractors are required to obtain a road usage permit for work affecting traffic flow. Click on a coloured line on the map for details about traffic impacts.
Permit number: RUP2025-0005
MAYER RD to SPRINGFIELD RD
January 14, 2025 - 9:00am to January 14, 2026 - 3:00pm
Lane Drop - Multi Lane Road
390 Carion on 350 Beaver Lake Rd - install bulk water Kiosks and associated watermain and storm system upgrades
Permit number: RUP2025-0171
JIM BAILEY RD to BEAVER LAKE CT
March 3, 2025 - 7:00am to June 15, 2025 - 6:00pm
Lane Drop - Multi Lane Road
Abandon steel gas main. Work includes exposing main with backhoe/hydrovac, welding (stop-off fittings, purge fittings and caps), purging lines and backfiling
Permit number: RUP2025-0153
LEADER RD to SPIERS RD
February 24, 2025 - 9:00am to March 7, 2025 - 3:30pm
Lane Drop - Multi Lane Road
PARSONS RD to KLO RD
February 24, 2025 - 9:00am to March 7, 2025 - 3:30pm
Lane Drop - Multi Lane Road
Abbott St 2851 - Using a lift in the curb lane and sidewalk on the north side of West Ave (per Appendix B) for exterior renovation works at the Project site such as installing siding, gutters, soffit, skylights, and windows, etc.
A crosswalk is to be i
Permit number: RUP2025-0169
ABBOTT ST to PANDOSY ST
March 2, 2025 - 7:00am to May 5, 2025 - 4:00pm
No Disruption
Abbott St 3061 - shallow utility installation. Road will be closed 7am to 5pm Mon to Fri.
Permit number: RUP2024-0795
ABBOTT ST to PANDOSY ST
August 27, 2024 - 7:00am to March 28, 2025 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Appaloosa Rd 2978 - The work will consist of setting up a mock work zone on Appaloosa Rd. to conduct the on-road training session where TCP Students learn to set up signs and work area properly according to standards, control traffic safely, and remove al
Permit number: RUP2025-0125
Project contact: Rick Cox
Email: [email protected]
ARAB RD to ARAB CT
April 1, 2025 -
11:00am to 3:00pm
Single Lane Alternating
ARAB CT to ACADEMY WAY
April 1, 2025 -
11:00am to 3:00pm
Single Lane Alternating
Baron Rd 1725 - Accessing multiple service vaults
Permit number: RUP2025-0160
Project contact: MTI MOTT Telecom
SPEDDING CT to ZIPRICK RD
March 6, 2025 - 9:00am to March 7, 2025 - 3:30pm
Lane Drop - Multi Lane Road
CARSHYL CT to BARON RD
March 6, 2025 - 9:00am to March 7, 2025 - 3:30pm
Lane Drop - Multi Lane Road
Begley Rd 1325 - 8' x 10' Sea can placed at the bottom of driveway to store furniture while replacing flooring
Permit number: RUP2025-0108
Project contact: Matt Webb
GRAN RD to WEST END OF ROAD
February 1, 2025 (All day) to April 1, 2025 (All day)
No Disruption
Belaire 1840 & Chandler St 1850 - hoarding sidewalk for office site, garbagte disposal, storage C-Can, loading and unloading of trucks. Site is fully fenced.
Permit number: RUP2025-0035
DEVONSHIRE AVE to CHANDLER ST
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
PRIDHAM AVE to BELAIRE AVE
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
Bertram Ave 1333 - garbage bin in 2 City parking stalls
Permit number: RUP2024-0944
FULLER AVE to CAWSTON AVE
October 8, 2024 (All day) to March 2, 2025 (All day)
No Disruption
Bertram St (Leon to Harvey Ave ) NB & SB - construction of the north ramp overpass. Works include asphalt, landscaping, concrete removal, deep and shallow foundation work, construction of an ongrade and suspended concrete ramp structure.
Permit number: RUP2024-0141
HARVEY AVE to LEON AVE
March 4, 2024 - 7:00am to April 1, 2025 - 5:00pm
Full Road Closure, No Through Traffic, Detour
Bertram St 1333 - opening up a section of sidewalk bet corner of Bertrams St and & Cawsons Ave and site entrance to 1333 Bertram. Install Fortis conduit and an 832. Restoring sidewalk once completed.
Permit number: RUP2025-0069
BERTRAM ST to RICHTER ST
January 21, 2025 - 7:00am to March 14, 2025 - 5:00pm
No Disruption
FULLER AVE to CAWSTON AVE
January 21, 2025 - 7:00am to March 14, 2025 - 5:00pm
No Disruption
Bertram St 1333 - Breezeway install along sidewalk infront of address. Will allow pedestrians to use the sidewalk without construction impedance. Office on top of breezeway.
Permit number: RUP2025-0122
FULLER AVE to CAWSTON AVE
February 2, 2025 (All day) to March 2, 2025 (All day)
No Disruption
Bertram St 1333 - lay down area for construction material
Permit number: RUP2025-0043
BERTRAM ST to LANE
January 2, 2025 (All day) to March 2, 2025 (All day)
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Boynton Pl 630 - BA 100m2 parks parking lot is currently prohibiting construction equipment access to the North side of our construction site. Construction access will be required for a number of months in order to accommodate the equipment needed to ins
Permit number: RUP2024-0828
HIGHPOINTE DR to CARAMILLO RD
September 1, 2024 (All day) to March 31, 2025 (All day)
No Disruption
Boynton Pl 630 - parking space and sidewalk use for construction in area.
Permit number: RUP2025-0061
HIGHPOINTE DR to CARAMILLO RD
January 1, 2025 (All day) to June 30, 2025 (All day)
No Disruption
Bryden Rd 145 - TELUS Utility Work - Pole, service vault and manhole access for cable placing and splicing.
Permit number: RUP2025-0140
Project contact: Todd Basso
Email: [email protected]
HWY 33 W to HOUGHTON RD
March 17, 2025 - 9:00am to March 21, 2025 - 3:00pm
Lane Drop - Multi Lane Road, Single Lane Alternating
Canyon Falls Crt 1849 - Storing materials on road temporary for construction. On Canyon Ridge Cr side of property.
Permit number: RUP2025-0133
EAST END OF ROAD to CANYON RIDGE CR
February 6, 2025 (All day) to March 6, 2025 (All day)
No Disruption
CANYON FALLS CT to CANYON RIDGE CT
February 6, 2025 (All day) to March 6, 2025 (All day)
No Disruption
Central Rutland Sewer SE Phase - road and Utilities construction. Removals, underground sewer main and services, gravels, asphalt, curb, sidewalk, electrical and landscaping work.
Permit number: RUP2025-0156
JUPITER CT to BELGO RD
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
PRINCESS RD to RUTLAND RD S
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
BELL RD to BELGO RD
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
CLARISSA RD to BELGO RD
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
BELL RD to PRINCESS RD
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
SOUTH END OF ROAD to BELGO RD
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
LUCAS CT to BELL RD
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
MOLNAR RD to LUCAS CT
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
PRINCESS RD to EAST END OF ROAD
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
DEAD END to CLARISSA RD
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
TEASDALE RD to NORTH END OF ROAD
February 25, 2025 (All day) to May 30, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
Chandler St/Belaire Ave/Pridham - use of street and sidewalk for site office, garage disposal storage. C-can loading and unloading of trucks. Site is fully fenced.
Permit number: RUP2024-1148
DEVONSHIRE AVE to CHANDLER ST
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
DEVONSHIRE AVE to CHANDLER ST
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
PRIDHAM AVE to BELAIRE AVE
January 1, 2025 (All day) to March 31, 2025 (All day)
No Disruption
Clement Ave 647 - Sidewalk closure along Clement Ave. to allow for excavation of building which requires existing sidewalk removal, backfill ,and re-in statement of sidewalk to city standards. Existing sidewalk is 60m x 1.2 = 79m2. Please refer to attache
Permit number: RUP2025-0041
Project contact: Fraser Campbell
Email: [email protected]
ST PAUL ST to RICHTER ST
January 11, 2025 (All day) to June 30, 2025 (All day)
No Disruption
Comment:Abbott St 3061/Cedar Ave - extend construction fencing to the edge of the roadway to allow for a safer work area for site personnel as well as the general public. Ongoing construction of an 87 unit wood frame, 7 story building.
The developer did
Permit number: RUP2023-0972
ABBOTT ST to PANDOSY ST
January 1, 2024 - 7:00am to August 31, 2025 - 7:00pm
No Disruption
MEIKLE AVE to NEWSOM AVE
January 1, 2024 - 7:00am to August 31, 2025 - 7:00pm
No Disruption
Coopland Cr 3-722 - remove and dispose fire damaged debris of structure inside unit 3 at 722 Coopland into a seacan on city road shoulder, remove drywall.
Permit number: RUP2025-0118
Project contact: Krissy
Email: [email protected]
RICHTER ST to RICHTER ST
February 6, 2025 - 8:00am to March 6, 2025 - 9:00pm
No Disruption
Coronation Ave 1036 - permit to install street lights, sidewalk and road frontage
Permit number: RUP2025-0165
Project contact: Sarb Hayer
Email: [email protected]
GRAHAM ST to GORDON DR
February 26, 2025 - 7:00am to March 4, 2025 - 8:00pm
Single Lane Alternating
Coronation Ave 880 (Lanes) - removal of old a/c sewer, install of new sewer, pave prep and pave in alleys traveling north and south along Coronation Ave on east side (Ethel) resulting in a full closure of affected alleys. Access to remainder of the alle
Permit number: RUP2025-0157
DEAD END to CORONATION AVE
March 3, 2025 (All day) to April 3, 2025 (All day)
DEAD END to CORONATION AVE
March 3, 2025 (All day) to April 3, 2025 (All day)
Full Road Closure, No Through Traffic, Detour
CORONATION AVE to CLEMENT AVE
March 3, 2025 (All day) to April 3, 2025 (All day)
CORONATION AVE to CLEMENT AVE
March 3, 2025 (All day) to April 3, 2025 (All day)
Full Road Closure, No Through Traffic, Detour
RICHTER ST to ETHEL ST
March 3, 2025 (All day) to April 3, 2025 (All day)
Dougal Rd S 165 - sidewalk closure for building construction purposes. Sidewalk closure signs posted and pedestrians detoured to sidewalk on other side of the street. 60 meters used. TMP attached
Permit number: RUP2024-1014
GRAY RD to VALLEYVIEW RD
October 31, 2024 (All day) to April 9, 2025 (All day)
No Disruption
Dougall Rd N 540 - install shallow utilities. Restoration of road.
Permit number: RUP2025-0155
MCINTOSH RD to LEATHEAD RD
March 3, 2025 (All day) to March 4, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
Doyle Ave 550 - Inspection of the storm line on Doyle and St Paul
Permit number: RUP2025-0164
Project contact: Ryan Holt
Email: [email protected]
ST PAUL ST to BERTRAM ST
March 3, 2025 -
7:00am to 12:00pm
Single Lane Alternating
DOYLE AVE to CAWSTON AVE
March 3, 2025 -
7:00am to 12:00pm
Single Lane Alternating
Doyle Ave 550 / St Paul St- Jersey barrier set up along alley, Doyle Ave and St Paul for public safety from construction traffic and future excavation
Permit number: RUP2023-0973
Project contact: Lauren Cooper
Email: [email protected]
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2025 (All day)
Lane Drop - Multi Lane Road
ST PAUL ST to BERTRAM ST
January 1, 2024 (All day) to December 31, 2025 (All day)
Lane Drop - Multi Lane Road
DOYLE AVE to CAWSTON AVE
January 1, 2024 (All day) to December 31, 2025 (All day)
Lane Drop - Multi Lane Road
Doyle Ave 550/St Paul St - craning reinforcing into excavation, necessitated due to 6' tie off rule and leading edge into excavation when truck is pulled into site hoarding drive aisle. Traffic control and flaggers will be removed in between deliveries
Permit number: RUP2025-0170
Project contact: Scott Spiers
Email: [email protected]
DOYLE AVE to CAWSTON AVE
February 27, 2025 - 7:30am to March 5, 2025 - 2:00pm
Single Lane Alternating
Ethel St 2255/ Glenwood Ave/Guisachan Rd - surveying of intersections and roads. Holding traffic while doing center line. Will cover stop signs at intersection when we have control of said intersection.
Permit number: RUP2025-0172
Project contact: Christina Muller
Email: [email protected]
ROSE AVE to GLENWOOD AVE
March 5, 2025 - 9:00am to March 14, 2025 - 4:00pm
Single Lane Alternating
ETHEL ST to CHAROLAIS RD
March 5, 2025 - 9:00am to March 14, 2025 - 4:00pm
Single Lane Alternating
ETHEL ST to GORDON DR
March 5, 2025 - 9:00am to March 14, 2025 - 4:00pm
Single Lane Alternating
ROSE AVE to ETHEL ST
March 5, 2025 - 9:00am to March 14, 2025 - 4:00pm
Single Lane Alternating
GLENWOOD AVE to ETHEL ST
March 5, 2025 - 9:00am to March 14, 2025 - 4:00pm
Single Lane Alternating
Fortis Gas Weekly Service Installs - various City streets
Permit number: RUP2025-0176
TWINFLOWER CR to HILL SPRING PL
February 28, 2025 - 9:00am to March 14, 2025 - 3:00pm
Single Lane Alternating
MCCARREN AVE to CHUTE LAKE RD
February 28, 2025 - 9:00am to March 14, 2025 - 3:00pm
Single Lane Alternating
POWICK RD to HWY 33 W
February 28, 2025 - 9:00am to March 14, 2025 - 3:00pm
Single Lane Alternating
VALLEYVIEW RD to GRAY RD
February 28, 2025 - 9:00am to March 14, 2025 - 3:00pm
Single Lane Alternating
HIRAM WALKER CT to JIM BAILEY CR
February 28, 2025 - 9:00am to March 14, 2025 - 3:00pm
Single Lane Alternating
Fortis Gas Weekly Service Installs - various City streets
Permit number: RUP2025-0154
JOHNSON RD to WOODLAND CR
February 21, 2025 - 9:00am to March 7, 2025 - 3:00pm
Single Lane Alternating
SOUTH END OF ROAD to HWY 33 W
February 21, 2025 - 9:00am to March 7, 2025 - 3:00pm
Single Lane Alternating
POWICK RD to HWY 33 W
February 21, 2025 - 9:00am to March 7, 2025 - 3:00pm
Single Lane Alternating
LEADER RD to SPIERS RD
February 21, 2025 - 9:00am to March 7, 2025 - 3:00pm
Single Lane Alternating
LEADER RD to SPIERS RD
February 21, 2025 - 9:00am to March 7, 2025 - 3:00pm
Single Lane Alternating
PARET RD to THORNELOE RD
February 21, 2025 - 9:00am to March 7, 2025 - 3:00pm
Single Lane Alternating
VALLEYVIEW RD to GRAY RD
February 21, 2025 - 9:00am to March 7, 2025 - 3:00pm
Single Lane Alternating
HIRAM WALKER CT to JIM BAILEY CR
February 21, 2025 - 9:00am to March 7, 2025 - 3:00pm
Single Lane Alternating
SOUTH END OF ROAD to TRAMONTO CT
February 21, 2025 - 9:00am to March 7, 2025 - 3:00pm
Single Lane Alternating
TWINFLOWER CR to HILL SPRING PL
February 21, 2025 - 9:00am to March 7, 2025 - 3:00pm
Single Lane Alternating
Frost Rd / chute Lake Cres/Treadgold Crt - Continued from permit 2024-1103 which was closed. Connect Frost Rd from Treadgold to Chute Lake Rd and add round-a-bout at the intersection of Chute Lake Rd, Frost Rd & Chute Lake Cres
Permit number: RUP2025-0040
TREADGOLD CT to KILLDEER RD
January 9, 2025 - 7:00am to April 15, 2025 - 9:00pm
Single Lane Alternating
CHUTE LAKE CR to FROST RD
January 9, 2025 - 7:00am to April 15, 2025 - 9:00pm
Single Lane Alternating
Frost Rd 1055 - the project involves constructing a secure pedestrian scaffold tunnel along the sidewalk at the frontage of road.
Permit number: RUP2024-1052
Project contact: Josh Arneson
Email: [email protected]
GORDON DR to STEELE RD
December 2, 2024 - 7:00am to December 31, 2025 - 6:00pm
No Disruption
High Rd 1650 - replace 20m of sewer pipe on residential property. are repairing a sewer line per attached but need to park our vehicles on the sidewalk (not actually digging on the sidewalk). The work will be performed in the yard of a private residenc
Permit number: RUP2025-0166
TRONSON DR to CALDOW ST
February 26, 2025 - 7:00am to March 4, 2025 - 5:00pm
No Disruption
Hoarding - portion of road.
Permit number: RUP2024-1000
GORDON DR to ASPEN CT
February 6, 2025 - 7:00am to April 30, 2025 - 5:00pm
Single Lane Alternating
Lakeshore Rd 3377 - deliveries, concrete pours etc for this project.
Permit number: RUP2025-0052
Project contact: Dean Jones
Email: [email protected]
RICHTER ST to LANFRANCO RD
January 10, 2025 - 7:00am to March 15, 2025 - 4:00pm
No Disruption
Lakeshore Rd 3950 (laneway) - Groundwater monitoring and sampling of existing monitoring wells in the laneway behind 3950 Lakeshore Rd.
Delineators will be used to barricade work zones during groundwater sampling and monitoring activities.
Work area wi
Permit number: RUP2025-0094
RADANT RD to LAKESHORE RD
March 4, 2025 - 7:00am to March 6, 2025 - 5:00pm
No Disruption
Leckie Pl - Telus shallow utility installation works along Leckie Pl frontage from Just west of Dilworth Dr to Okanagan Rail Trail. TCP to assist cyclists/pedestrians along Rail Trail/Leckie ATC corridor passing active work zone.
Permit number: RUP2025-0073
WEST END OF ROAD to DILWORTH DR
February 21, 2025 - 7:00am to March 7, 2025 - 5:30pm
Lane Drop - Multi Lane Road
Leon Ave 278 - usage of partial lane and sidewalk on the north site of Leon Ave bet Abbott and Water St for the Water Street by the Park Project. Used for deliveries and lay down for general construction activities.
Permit number: RUP2025-0087
ABBOTT ST to WATER ST
January 1, 2025 (All day) to May 31, 2025 (All day)
No Disruption
Leon Ave 278 non excavation work only. Deliveries and entering or exiting site.
Permit number: RUP2025-0022
Project contact: Stephanie Mattson
Email: [email protected]
ABBOTT ST to WATER ST
January 1, 2025 - 7:00am to December 31, 2025 - 5:00pm
Lane Drop - Multi Lane Road
McCurdy Rd 948 - install Rogers conduit via directional drill on shoulder, sidewalk & Brick parking lot.
Permit number: RUP2025-0143
ALSGARD ST to DALTON RD
March 3, 2025 - 9:00pm to March 17, 2025 - 6:00am
Lane Drop - Multi Lane Road
MCCURDY RD to FENWICK RD
March 3, 2025 - 9:00pm to March 17, 2025 - 6:00am
Lane Drop - Multi Lane Road
HWY 97 N to ALSGARD ST
March 3, 2025 - 9:00pm to March 17, 2025 - 6:00am
Lane Drop - Multi Lane Road
Noble Crt 1550 - construction trailer on City road shoulder and block sidewalk along west side of Noble Crt. (two way traffic to be maintained) Pedestrians can cross Noble Crt on Bernard Ave and use sidewalk on the East side of Noble Crt
Permit number: RUP2024-0695
Project contact: Joe Reynolds
Email: [email protected]
SOUTH END OF ROAD to BERNARD AVE
July 25, 2024 (All day) to June 30, 2025 (All day)
No Disruption
Parks Mtce Duties - non excavation. Tree trimming, irrigation etc.
Permit number: RUP2025-0020
WATER ST to PANDOSY ST
January 15, 2025 - 8:00am to January 15, 2026 - 2:30pm
Lane Drop - Multi Lane Road, Single Lane Alternating
Penno Rd 360 - install catch basins and tie into city storm system
Permit number: RUP2025-0168
VINELAND ST to DILWORTH CR
March 3, 2025 - 7:00am to March 7, 2025 - 5:00pm
Lane Drop - Multi Lane Road
BERNARD AVE to RIDGEWAY DR
March 3, 2025 - 7:00am to March 7, 2025 - 5:00pm
Lane Drop - Multi Lane Road
DILWORTH CR to SPALL RD
March 3, 2025 - 7:00am to March 7, 2025 - 5:00pm
Lane Drop - Multi Lane Road
NORRIS RD S to EAST END OF ROAD
March 3, 2025 - 7:00am to March 7, 2025 - 5:00pm
Lane Drop - Multi Lane Road
Pridham Ave 1380 - construction deliveries
Permit number: RUP2025-0036
Project contact: Mike Partington
Email: [email protected]
DEVONSHIRE AVE to CHANDLER ST
January 13, 2025 - 7:00am to December 31, 2025 - 3:00pm
Single Lane Alternating
Richter St 2419/2417 & 2421 - seacan storage container on road shoulder
Permit number: RUP2025-0121
Project contact: Mimi Rybachuk
Email: [email protected]
FRANCIS AVE to BIRCH AVE
March 10, 2025 (All day) to March 13, 2025 (All day)
No Disruption
Richter St 2609 - site hoarding area for storage of materials (Bike lane not affected. Total area is 55 m2 in area.
Permit number: RUP2024-0065
KINNEAR AVE to WARDLAW AVE
January 15, 2024 (All day) to March 31, 2025 (All day)
No Disruption
Richter St 2609-2611 - flush and camera STM Line
Permit number: RUP2025-0058
KINNEAR AVE to WARDLAW AVE
January 1, 1900 (All day) to December 31, 2025 (All day)
Robson Rd W 265 - Seacans, construction trailers and materials on city ROW. Site fenced on ROW and excavated past PL for foundation walls.
Permit number: RUP2025-0085
JUROME RD to ROBSON RD E
January 9, 2025 (All day) to March 8, 2025 (All day)
No Disruption
JUROME RD to ROBSON RD E
January 9, 2025 (All day) to March 8, 2025 (All day)
Royal Ave & Long St - laydown and trailer site/seacan placement.
Permit number: RUP2023-0990
Project contact: Brady Allen
Email: [email protected]
LONG ST to PANDOSY ST
January 1, 2024 - 7:00am to April 30, 2025 - 5:30pm
Lane Drop - Multi Lane Road
Royal Ave 416 - Remove and replace existing Storm and add Manholes in CBs BACK LANE CLOSURE. Not closing Royal Ave.
Permit number: RUP2025-0110
LONG ST to PANDOSY ST
February 18, 2025 - 7:00am to March 25, 2025 - 5:00pm
Local Traffic Only
Rutland Rd N 169 - one lane and sidewalk closure for material laydown and deliveries/hoisting. A pedestrian provision has been accounted for. Total of 165 sqm of workk zone.
Permit number: RUP2024-0180
Phone: 403-367-1330
Email: [email protected]
HWY 33 W to SHEPHERD RD
March 1, 2024 (All day) to September 30, 2025 (All day)
Lane Drop - Multi Lane Road
Saucier Ave 812 - closure of sidewalk, shoulder and single westbound lane of Saucier Ave. Site hoarding for 2025
Permit number: RUP2025-0064
Project contact: Brodie Scott
Email: [email protected]
RICHTER ST to ETHEL ST
January 1, 2025 (All day) to December 31, 2025 (All day)
Lane Drop - Multi Lane Road, No Disruption
Stockwell Ave (Richter St to Ethel St) & Side Lane (North side) only to the T-Intersection of Lane. Will have access off of Fuller - Watermain and Storm drainage upgrades.
Permit number: RUP2025-0120
RICHTER ST to ETHEL ST
March 3, 2025 - 7:00am to June 30, 2025 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
RICHTER ST to ETHEL ST
March 3, 2025 - 7:00am to June 30, 2025 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
STOCKWELL AVE to FULLER AVE
March 3, 2025 - 7:00am to June 30, 2025 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
STOCKWELL AVE to FULLER AVE
March 3, 2025 - 7:00am to June 30, 2025 - 5:30pm
Full Road Closure, Local Traffic Only, No Through Traffic, Detour
Underhill St & Baron Rd - closure of the sidewalk and bike lane on Baron Rd to accommodate construction. cyclists and peds will have signed detour route.
Crosswalk to be setup on Underhill.
Permit number: RUP2024-1159
Project contact: Esther Elechi
Email: [email protected]
DILWORTH DR to UNDERHILL ST
January 20, 2025 (All day) to December 31, 2025 (All day)
No Disruption
HAYNES RD to BARON RD
January 20, 2025 (All day) to December 31, 2025 (All day)
No Disruption
Union Road between Upper Canyon Dr and Begbie Rd - Upgrading of existing storm main for future developments. Extend Sanitary, water, and shallow utilities into future developments. Widen out road for new turning movements, and Multi Use Path. Concrete fla
Permit number: RUP2025-0077
BEGBIE RD to UPPER CANYON DR N
January 27, 2025 (All day) to May 15, 2025 (All day)
Local Traffic Only
Various Citygrowing seasons. We are also responsible for suckers and weed growth in the medians.
Permit number: RUP2025-0151
MCCLURE RD to HARMONY CT
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BUCK RD to MCCLURE RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BREDIN RD to AMBROSI RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
AMBROSI RD to BARLEE RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
PACIFIC AVE to SUTHERLAND AVE
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
SUTHERLAND AVE to BORDEN AVE
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BORDEN AVE to LAURIER AVE
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
YATES RD to WATSON RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
WILKINSON ST to INKAR RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
INKAR RD to BURTCH RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BURTCH RD to DAYTON ST
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
DAYTON ST to KIRSCHNER RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
KIRSCHNER RD to SPALL RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
SPALL RD to BREDIN RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
LEQUIME RD to LEXINGTON DR
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
KLO RD to RAYMER AVE
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BYRNS RD to COOPER RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
COOPER RD to MAYER RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
GORDON DR to HOY ST
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
HOY ST to WILKINSON ST
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BALSAM RD to HAZELL RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
HAZELL RD to SAN MICHELLE RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
YOUNG RD to PARET PL
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
SAN MICHELLE RD to YOUNG RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
WELKE RD to OLD MEADOWS RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
OLD MEADOWS RD to LEQUIME RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
VANCE AVE to BUCK RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
HARMONY CT to RAYMER RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
RAYMER RD to SCHAFER RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
SCHAFER RD to DEHART RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
CERISE DR to CLIFTON RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
GORDON DR to FROST RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
DALLAS RD to CROSS RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
GLENMEADOWS RD to YATES RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
GLENMORE DR to GLENMEADOWS RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
THORNELOE RD to VANCE AVE
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BURTCH RD to BENVOULIN RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
WYNDHAM CR to GLENMORE RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
CASORSO RD to BARNES AVE
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BARNES AVE to LADNER RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BOTHE RD to KLO RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
LADNER RD to BOTHE RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BROOKSIDE AVE to PACIFIC AVE
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BEDFORD RD to SWAMP RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
QUILCHENA DR to FARRON PL
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
CLIFTON RD to SPALL RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
DEHART RD to TOZER CT
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
TOZER CT to BALSAM RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
MISSION SPRINGS CR to CASORSO RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
COOK RD to MISSION SPRINGS CR
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
LEXINGTON DR to COOK RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
PARET RD to THORNELOE RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
STEELE RD to PARET RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
KAMLOOPS RD to CASORSO RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
RAYMER AVE to CAMERON AVE
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
MOUNTAIN AVE to TRONSON DR
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
PARET PL to WELKE RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
FARRON PL to CHUTE LAKE RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
EDGEHILL AVE to SNOWSELL ST
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
SNOWSELL ST to WYNDHAM CR
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
CROSS RD to UNION RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
GLENMORE RD to SCENIC RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BENVOULIN RD to GORDON DR
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
CASORSO RD to RISSO RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
SWAMP RD to BENVOULIN RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
WATSON RD to BALLOU RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
BALLOU RD to DALLAS RD
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
TRONSON DR to SUMMIT DR
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
GORDON DR to CERISE DR
March 1, 2025 - 9:00am to October 31, 2025 - 3:30pm
Continually Moving Work
Walker Rd 970 - Urgent repair - Work with Fortis to repair boxes because of water coming from a pool, causing water to go at J-bend at house meter.
Note.. this is 970 Walker Dr
Permit number: RUP2025-0173
ST ANDREWS DR to NORTH END OF ROAD
February 28, 2025 - 7:00am to March 3, 2025 - 3:30pm
Single Lane Alternating
Water St 1580 & 1570 - Demolish building and construct new building. Hoarding required on Lawrence, lane and Water St
Permit number: RUP2025-0150
Project contact: Slava Korshunov
Email: [email protected]
ABBOTT ST to WATER ST
March 1, 2025 (All day) to April 30, 2025 (All day)
Lane Drop - Multi Lane Road
LAWRENCE AVE to LANE
March 1, 2025 (All day) to April 30, 2025 (All day)
Lane Drop - Multi Lane Road
Water St 1659 / Leon Ave - errect scafolding to close portion of walkway at the corner to work on building.
Permit number: RUP2024-0008
WATER ST to PANDOSY ST
January 5, 2024 (All day) to December 31, 2025 (All day)
No Disruption
HARVEY AVE to LEON AVE
January 5, 2024 (All day) to December 31, 2025 (All day)
No Disruption
Water St 1831 ( side back lane) - asphalt removal and replacement, storm and sanitary installation along with storm line. full back lane closure to the south of site.
Permit number: RUP2025-0158
LAKE AVE to WATER ST
February 28, 2025 (All day) to March 28, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour
Water St 1831 - Block off parking lane and sidewalk of North bound side of road. Access for COK workers to existing facility during construction of new building. Tree removal access, Fortis BC gas and hydro work along the sidewalk. Removal and import of s
Permit number: RUP2025-0109
LAKE AVE to RIVERSIDE AVE
February 4, 2025 (All day) to March 31, 2025 (All day)
Lane Drop - Multi Lane Road
Wilkinson St 2110-2140 - NORTHBOUND WILL REMAIN OPEN. road closure of southbound Wilkinson, with north bound open to SPRINGFIELD. 4 homes impacted across the street. Pedestrians will have access on the northbound side only. Removal of asphalt along Wilk
Permit number: RUP2025-0159
Phone: 250-869-9005
Email: [email protected]
MCBRIDE RD to SPRINGFIELD RD
March 3, 2025 (All day) to April 25, 2025 (All day)
Full Road Closure, Local Traffic Only, Detour