Commercial, industrial & large multi-family buildings

Home > Homes & building > Building permits & inspections > Apply for a building permit > Commercial, industrial & large multi-family buildings

New online application process:

Apply for a permitUpdate and track applications

If you're experiencing an issue with the new application process, please use the button below to let us know.

Report an issue

How to prepare to apply:

New Commercial

Prepare the following materials:

Checklists and bulletins:

Commercial Mixed Use - New

Prepare the following materials:

Checklists and bulletins:

New Industrial

Prepare the following materials:

Checklists and bulletins:

Commercial/Industrial Addition

Prepare the following materials:

  • State of Title, current within last 30 days, including copies of all covenants, easements and right-of-ways
  • Scaled drawings - two (2) complete sets are required (must be the "For Construction Drawings"), and site plans (if scaled plans are greater than 11x17). These can be delivered to City Hall (2nd Floor, attn "Application Centre").
  • Structural & Geotechnical schedules and drawings (Schedule B, D & Insurance), if applicable
  • Energy Step Code Documentation, if applicable
  • Construction Fire Safety plan
  • Roof truss package, complete with future solar panel loading
  • Interior Health approval, if applicable

Checklists and bulletins:

Commercial/Industrial Renovation

Prepare the following materials:

  • Scaled drawings - two (2) complete sets are required (must be the "For Construction Drawings"), and site plans (if scaled plans are greater than 11x17). These can be delivered to City Hall (2nd Floor, attn "Application Centre").
  • Structural & Geotechnical schedules and drawings (Schedule B, D & Insurance), if applicable
  • Interior Health approval, if applicable
  • Key Plan, if applicable

Checklists and bulletins:

Kitchen Canopy

Prepare the following materials:

  • Scaled drawings - two (2) complete sets are required (must be the "For Construction Drawings"), and site plans (if scaled plans are greater than 11x17). These can be delivered to City Hall (2nd Floor, attn "Application Centre").
  • Structural & Geotechnical schedules and drawings (Schedule B, D & Insurance), if applicable

Checklists and bulletins:

For more information, please review:

  • Submissions of full sized paper copies of plans and roof truss packages will be accepted at City Hall (2nd Floor, attn "Application Centre").
  • Cosmetic changes such as painting, flooring, replacing baseboards and resurfacing cabinets do not require a building permit. Please refer the building bylaw to see when a permit is required.
  • A separate application is required for each building.
  • Building permit application fees will be emailed to you with a link to pay online, payment of the fee is a required part of a complete application.
  • For information regarding Shell Buildings, please see the corresponding bulletin found on the bulletin and frequently used documents page

Need help? Contact us at [email protected] or 250-469-8960.